[1] 莫世扬,杨晓伟,洪元堂,等.非开挖顶管工艺在公路污水管线下穿工程中应用分析[J].公路工程,2019,44(2):151-155.
MO Shi-yang,YANG Xiao-wei,HONG Yuan-tang,et al. Application analysis of trenchless pipe jacking technology in highway sewage pipeline project[J]. Highway Engineering, 2019, 44(2): 151-155.(in Chinese)
[2] POVARNITSYN S, MARTYNUK A, BRUSNIK O. Developing the drilling tool for trenchless pipeline construction[J]. IOP Conference, 2016, 43: 012069.
[3] 朱建明,赵沙沙,江 强,等.软土地区定向钻工后地表沉降的机理分析[J].煤炭学报,2012,37(增1):86-91.
ZHU Jian-ming, ZHAO Sha-sha, JIANG Qiang, et al. The analytical solutions of post-construction settlement and its application in the directional drilling engineering[J]. Journal of China Coal Society, 2012, 37(S1): 86-91.(in Chinese)
[4] ARIARATNAM S T. Survey questionnaire results of the current level of knowledge on trenchless technologies in China[J]. Tunnelling and Underground Space Technology, 2010, 25(6): 802-810.
[5] 郭林飞,柴仕琦,董静怡,等.我国城市路面塌陷事故统计分析[J].工程管理学报,2020,34(2):49-54.
GUO Lin-fei, CHAI Shi-qi, DONG Jing-yi, et al. A statistical analysis of urban road collapse accidents in China[J]. Journal of Engineering Management, 2020, 34(2): 49-54.(in Chinese)
[6] 蔡跃军,刘宝琛.近地表隧道开挖地表移动及变形计算[J].矿冶工程,1991,11(1):6-9.
CAI Yue-jun, LIU Bao-chen. Computer analysis for calculation of ground surface movement and deformation due to near-surface tunnel excavation[J]. Mining and Metallurgical Engineering, 1991, 11(1): 6-9.(in Chinese)
[7] 刘宝琛,张家生.近地表开挖引起的地表沉降的随机介质方法[J].岩石力学与工程学报,1995,14(4):289-296.
LIU Bao-chen, ZHANG Jia-sheng. Stochastic method for ground subsidence due to near surface excavation[J]. Chinese Journal of Rock Mechanics and Engineering, 1995, 14(4): 289-296.(in Chinese)
[8] 刘宝琛.随机介质理论及其在开挖引起的地表下沉问题中的应用[J].中国有色金属学报,1992,2(3):8-14.
LIU Bao-chen. Stochastic medium method and its application in surface subsidence caused by excavation[J]. The Chinese Journal of Nonferrous Metals, 1992, 2(3): 8-14.(in Chinese)
[9] PECK R B. Deep excavations and tunnelling in soft ground[C]∥SMFE. Proceedings of the 7th International Conference on SMFE: State of the Art Volume. Mexico City: SMFE, 1969: 225-290.
[10] 喻 军,龚晓南.考虑顶管施工过程的地面沉降控制数值分析[J].岩石力学与工程学报,2014,33(增1):2605-2610.
YU Jun, GONG Xiao-nan. Numerical analysis of surface settlement control considering pipe jacking construction process[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(S1): 2605-2610.(in Chinese)
[11] 李 达,孔 恒,郭 飞,等.土压平衡矩形顶管施工引起的地表沉降规律研究[J].中国安全生产科学技术,2018,14(10):144-150.
LI Da, KONG Heng, GUO Fei, et al. Research on ground settlement caused by rectangular pipe jacking construction with earth pressure balance[J]. Journal of Safety Science and Technology, 2018, 14(10): 144-150.(in Chinese)
[12] 谢延锁,李小杰,刘亚松,等.浅埋大管径顶管施工全过程数值模拟分析研究[J].现代隧道技术,2018,55(增2):459-465.
XIE Yan-suo, LI Xiao-jie, LIU Ya-song, et al. Numerical simulation and analysis of construction process of shallow and large diameter jacking pipes[J]. Modern Tunnelling Technology, 2018, 55(S2): 459-465.(in Chinese)
[13] 宋建学,张瑞鑫,孙宇赫.机械顶管施工中超挖和地面超载引起的地表沉降规律研究[J].建筑科学,2018,34(11):134-139.
SONG Jian-xue, ZHANG Rui-xin, SUN Yu-he. Research on surface settlement regularity caused by over excavation and ground overloading in mechanical pipe jacking[J]. Building Science, 2018, 34(11): 134-139.(in Chinese)
[14] 王 剑,邓宗伟.某超大直径断面顶管施工引起的地层位移分析[J].铁道科学与工程学报,2014,11(2):95-100.
WANG Jian, DENG Zong-wei. Analysis of ground surface settlement due to pipe jacking of super- large cross sections[J]. Journal of Railway Science and Engineering, 2014, 11(2): 95-100.(in Chinese)
[15] 张稳军,苏 忍,张高乐,等.考虑固结影响的双洞盾构隧道非同步施工引起的土体变形研究[J].中国公路学报,2016,29(9):103-111,151.
ZHANG Wen-jun, SHU Ren, ZHANG Gao-le, et al. Study on soil deformation induced by non-synchronous construction of double-tube shield tunnels considering consolidation[J]. China Journal of Highway and Transport, 2016, 29(9): 103-111, 151.(in Chinese)
[16] 来弘鹏,郑海伟,何秋敏,等.砂土地层盾构隧道小角度斜下穿既有隧道施工参数优化研究[J].中国公路学报,2018,31(10):130-140.
LAI Hong-peng, ZHENG Hai-wei, HE Qiu-min, et al. Investigation into parameter optimization of existing metro tunnel for shield tunnel closely undercrossing it at small angle in sand stratum[J]. China Journal of Highway and Transport, 2018, 31(10): 130-140.(in Chinese)
[17] 赖金星,王开运,侯丹丹,等.砂土地层顶管施工土体变形规律三维数值分析[J].西安科技大学学报,2015,35(4):450-457.
LAI Jin-xing, WANG Kai-yun, HOU Dan-dan, et al. 3D numerical analysis on displacement regularity of pipe jacking sewer in sand soil stratum[J]. Journal of Xi'an University of Science and Technology, 2015, 35(4): 450-457.(in Chinese)
[18] 艾志久,秦 浩,舒建华,等.水平定向穿越扩孔孔形沉降量预测[J].地下空间与工程学报,2018,14(2):477-482.
AI Zhi-jiu, QIN Hao, SHU Jian-hua,et al. Settlement prediction of hole shape in horizontal directional drilling and reaming[J]. Chinese Journal of Underground Space and Engineering, 2018, 14(2): 477-482.(in Chinese)
[19] 来弘鹏,赵 鑫,康 佐.黄土地区新建地铁隧道下穿时既有地铁线路沉降控制标准[J].交通运输工程学报,2018,18(4):63-71.
LAI Hong-peng, ZHAO Xin, KANG Zuo. Settlement control standard of existing metro line undercrossed by new metro tunnel in loess area[J]. Journal of Traffic and Transportation Engineering, 2018, 18(4): 63-71.(in Chinese)
[20] 白永学.富水砂卵石地层盾构施工诱发地层塌陷机理及对策研究[D].成都:西南交通大学,2012.
BAI Yong-xue. Research on ground collapse mechanism of shield tunnelling in saturated sandy pebble stratum and corresponding measures[D]. Chengdu: Southwest Jiaotong University, 2012.(in Chinese)
[21] 潘伟强.软土地区管幕群顶管施工地面沉降监测与分析[J].岩土工程学报,2019,41(增1):201-204.
PAN Wei-qiang. Monitoring and analysis of ground settlement during pipe roof construction of pipe-jacking groups in soft soil areas[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 201-204.(in Chinese)
[22] 黄雅娜,蒋 辉,李 竹,等.天津站铁路下方施工盾构隧道引起的沉降分析[J].建筑科学,2012,28(增1):246-249.
HUANG Ya-na, JIANG Hui, LI Zhu, et al. Settlement analysis of the construction of shield tunnel passing beneath Tianjin Railway Station[J]. Building Science, 2012, 28(S1): 246-249.(in Chinese)
[23] 王国炜,顾士国,刘 琳,等.油气输送管道水平定向钻下穿公路涉路工程技术评价研究[J].路基工程,2021(4):169-172.
WANG Guo-wei, GU Shi-guo, LIU Lin, et al. Research on technical evaluation of horizontal directional drilling undercrossing road of oil and gas transmission pipeline[J]. Subgrade Engineering, 2021(4): 169-172.(in Chinese)
[24] 方 勇,何 川.考虑施工过程的土压平衡式盾构隧道掘进数值分析[J].铁道工程学报,2009,26(11):56-60.
FANG Yong, HE Chuan. Numerical analysis of earth-pressure-balance shield driving considering based on construction course[J]. Journal of Railway Engineering Society, 2009, 26(11): 56-60.(in Chinese)
[25] 蔡 义,张成平,闵 博.邻近上覆空洞浅埋隧道施工引起的地层变形和破坏特征[J].铁道学报,2019,41(9):118-127.
CAI Yi, ZHANG Cheng-ping, MIN Bo. Analysis of ground deformation and failure induced by shallow tunneling with cavity in the overlying strata[J]. Journal of the China Railway Society, 2019, 41(9): 118-127.(in Chinese)
[26] 李文江,王用波,阎伟龙,等.软黏土顶管工后沉降数值模拟与模型试验[J].地下空间与工程学报,2021,17(增2):710-716.
LI Wen-jiang, WANG Yong-bo, YAN Wei-long, et al. Numerical simulation and model test of post construction settlement of soft clay pipe jacking[J]. Chinese Journal of Underground Space and Engineering, 2021, 17(S2): 710-716.(in Chinese)
[27] 姜洪建.超大断面矩形顶管隧道施工引起的地表沉降规律研究[D].郑州:华北水利水电大学,2019.
JIANG Hong-jian. Research on surface settlement law caused by construction of super large section rectangular pipe jacking tunnel[D]. Zhengzhou: North China University of Water Resources and Electric Power, 2019.(in Chinese)
[28] 李曙光.EPB盾构法隧道施工引起的地表沉降分析与数值模拟[D].长沙:中南大学,2006.
LI Shu-guang. Analysis and numerical simulation of ground settlement caused by EPB shield tunnel construction[D]. Changsha: Central South University, 2006.(in Chinese)
[29] 焦 义,梁 禹,冯金勇,等.多因素影响下顶管施工引起土体变形计算研究[J].铁道科学与工程学报,2021,18(1):192-199.
JIAO Yi, LIANG Yu, FENG Jin-yong, et al. Study on soil deformation caused by pipe jacking construction with multi-factor[J]. Journal of Railway Science and Engineering, 2021, 18(1): 192-199.(in Chinese)
[30] 张艳林,曾天成,甘 甜,等.真实复杂地层大直径钢顶管三维数值模拟研究[J].科学技术与工程,2020,20(33):13791-13798.
ZHANG Yan-lin, ZENG Tian-cheng, GAN Tian, et al. Three-dimensional numerical simulation of large-diameter steel pipe jacking in real and complex strata[J]. Science Technology and Engineering, 2020, 20(33): 13791-13798.(in Chinese)