|Table of Contents|

Regression analysis of influence law of urban pavement settlement caused by underpass tunnel construction in Beijing(PDF)

《交通运输工程学报》[ISSN:1671-1637/CN:61-1369/U]

Issue:
2022年02期
Page:
176-186
Research Field:
道路与铁道工程
Publishing date:

Info

Title:
Regression analysis of influence law of urban pavement settlement caused by underpass tunnel construction in Beijing
Author(s):
WU Yi-min1 LIU Yan-an2 WANG Heng2 HAN Da-you2 CHEN Zi-fan3 WANG Chao4
(1. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China; 2. Beijing Municipal Commission of Transport, Beijing 100073, China; 3. Department of Economics, Boston University, Boston 02134, Massachusetts, USA; 4. Beijing Municipal Commission of Development and Reform, Beijing 101160, China)
Keywords:
tunnel engineering underpass construction non-excavation construction pavement settlement regression analysis safety management
PACS:
U455.43
DOI:
10.19818/j.cnki.1671-1637.2022.02.013
Abstract:
Taking the pavement settlement caused by pipe jacking tunnels in thermal engineering in Chaoyang District of Beijing as an example, the on-site measurement value and the theoretical computation values that only considering natural factors were compared and analyzed. With 279 tunnel underpass projects in Beijing as samples, the multiple regression analysis was carried out with the statistical software Stata 14.0, where four design factors, three construction factors, and nine human factors affecting the pavement settlement were involved. Then, the robustness of regression analysis was verified by the replacement of the construction methods and the addition or subtraction of interpretation variables, and the elasticity coefficients, standard errors, and the confidence levels of each factor affecting pavement settlement were obtained. Analysis results show that a huge difference exists between the on-site measurement and the theoretical computation in the pavement settlement, which is related to the existence of moving loads on the pavement and the thickness of the overlying soil of tunnels, with a maximum of up to 3.75 times. Of the natural factors, the influence of geological condition, construction method, moving load on the pavement, and tunnel diameters are significant, and the degree of influence decreases in turn. Of the human factors, on-site supervision plays a significant role, and working years of constructors and technical disclosure also have a great impact. In the construction of an underpass project with a non-excavation method, we should reduce the manual pipe jacking, accelerate construction, and consolidate synchronous grouting to decrease the pavement settlement, and great significance should be attached to the construction technology and process, personnel organization, and process supervision. The research results can provide a reference for the technical management, safety assessment, and administrative approval of the construction of tunnels undercrossing urban roads. 6 tabs, 4 figs, 30 refs.

References:

[1] 莫世扬,杨晓伟,洪元堂,等.非开挖顶管工艺在公路污水管线下穿工程中应用分析[J].公路工程,2019,44(2):151-155.
MO Shi-yang,YANG Xiao-wei,HONG Yuan-tang,et al. Application analysis of trenchless pipe jacking technology in highway sewage pipeline project[J]. Highway Engineering, 2019, 44(2): 151-155.(in Chinese)
[2] POVARNITSYN S, MARTYNUK A, BRUSNIK O. Developing the drilling tool for trenchless pipeline construction[J]. IOP Conference, 2016, 43: 012069.
[3] 朱建明,赵沙沙,江 强,等.软土地区定向钻工后地表沉降的机理分析[J].煤炭学报,2012,37(增1):86-91.
ZHU Jian-ming, ZHAO Sha-sha, JIANG Qiang, et al. The analytical solutions of post-construction settlement and its application in the directional drilling engineering[J]. Journal of China Coal Society, 2012, 37(S1): 86-91.(in Chinese)
[4] ARIARATNAM S T. Survey questionnaire results of the current level of knowledge on trenchless technologies in China[J]. Tunnelling and Underground Space Technology, 2010, 25(6): 802-810.
[5] 郭林飞,柴仕琦,董静怡,等.我国城市路面塌陷事故统计分析[J].工程管理学报,2020,34(2):49-54.
GUO Lin-fei, CHAI Shi-qi, DONG Jing-yi, et al. A statistical analysis of urban road collapse accidents in China[J]. Journal of Engineering Management, 2020, 34(2): 49-54.(in Chinese)
[6] 蔡跃军,刘宝琛.近地表隧道开挖地表移动及变形计算[J].矿冶工程,1991,11(1):6-9.
CAI Yue-jun, LIU Bao-chen. Computer analysis for calculation of ground surface movement and deformation due to near-surface tunnel excavation[J]. Mining and Metallurgical Engineering, 1991, 11(1): 6-9.(in Chinese)
[7] 刘宝琛,张家生.近地表开挖引起的地表沉降的随机介质方法[J].岩石力学与工程学报,1995,14(4):289-296.
LIU Bao-chen, ZHANG Jia-sheng. Stochastic method for ground subsidence due to near surface excavation[J]. Chinese Journal of Rock Mechanics and Engineering, 1995, 14(4): 289-296.(in Chinese)
[8] 刘宝琛.随机介质理论及其在开挖引起的地表下沉问题中的应用[J].中国有色金属学报,1992,2(3):8-14.
LIU Bao-chen. Stochastic medium method and its application in surface subsidence caused by excavation[J]. The Chinese Journal of Nonferrous Metals, 1992, 2(3): 8-14.(in Chinese)
[9] PECK R B. Deep excavations and tunnelling in soft ground[C]∥SMFE. Proceedings of the 7th International Conference on SMFE: State of the Art Volume. Mexico City: SMFE, 1969: 225-290.
[10] 喻 军,龚晓南.考虑顶管施工过程的地面沉降控制数值分析[J].岩石力学与工程学报,2014,33(增1):2605-2610.
YU Jun, GONG Xiao-nan. Numerical analysis of surface settlement control considering pipe jacking construction process[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(S1): 2605-2610.(in Chinese)
[11] 李 达,孔 恒,郭 飞,等.土压平衡矩形顶管施工引起的地表沉降规律研究[J].中国安全生产科学技术,2018,14(10):144-150.
LI Da, KONG Heng, GUO Fei, et al. Research on ground settlement caused by rectangular pipe jacking construction with earth pressure balance[J]. Journal of Safety Science and Technology, 2018, 14(10): 144-150.(in Chinese)
[12] 谢延锁,李小杰,刘亚松,等.浅埋大管径顶管施工全过程数值模拟分析研究[J].现代隧道技术,2018,55(增2):459-465.
XIE Yan-suo, LI Xiao-jie, LIU Ya-song, et al. Numerical simulation and analysis of construction process of shallow and large diameter jacking pipes[J]. Modern Tunnelling Technology, 2018, 55(S2): 459-465.(in Chinese)
[13] 宋建学,张瑞鑫,孙宇赫.机械顶管施工中超挖和地面超载引起的地表沉降规律研究[J].建筑科学,2018,34(11):134-139.
SONG Jian-xue, ZHANG Rui-xin, SUN Yu-he. Research on surface settlement regularity caused by over excavation and ground overloading in mechanical pipe jacking[J]. Building Science, 2018, 34(11): 134-139.(in Chinese)
[14] 王 剑,邓宗伟.某超大直径断面顶管施工引起的地层位移分析[J].铁道科学与工程学报,2014,11(2):95-100.
WANG Jian, DENG Zong-wei. Analysis of ground surface settlement due to pipe jacking of super- large cross sections[J]. Journal of Railway Science and Engineering, 2014, 11(2): 95-100.(in Chinese)
[15] 张稳军,苏 忍,张高乐,等.考虑固结影响的双洞盾构隧道非同步施工引起的土体变形研究[J].中国公路学报,2016,29(9):103-111,151.
ZHANG Wen-jun, SHU Ren, ZHANG Gao-le, et al. Study on soil deformation induced by non-synchronous construction of double-tube shield tunnels considering consolidation[J]. China Journal of Highway and Transport, 2016, 29(9): 103-111, 151.(in Chinese)
[16] 来弘鹏,郑海伟,何秋敏,等.砂土地层盾构隧道小角度斜下穿既有隧道施工参数优化研究[J].中国公路学报,2018,31(10):130-140.
LAI Hong-peng, ZHENG Hai-wei, HE Qiu-min, et al. Investigation into parameter optimization of existing metro tunnel for shield tunnel closely undercrossing it at small angle in sand stratum[J]. China Journal of Highway and Transport, 2018, 31(10): 130-140.(in Chinese)
[17] 赖金星,王开运,侯丹丹,等.砂土地层顶管施工土体变形规律三维数值分析[J].西安科技大学学报,2015,35(4):450-457.
LAI Jin-xing, WANG Kai-yun, HOU Dan-dan, et al. 3D numerical analysis on displacement regularity of pipe jacking sewer in sand soil stratum[J]. Journal of Xi'an University of Science and Technology, 2015, 35(4): 450-457.(in Chinese)
[18] 艾志久,秦 浩,舒建华,等.水平定向穿越扩孔孔形沉降量预测[J].地下空间与工程学报,2018,14(2):477-482.
AI Zhi-jiu, QIN Hao, SHU Jian-hua,et al. Settlement prediction of hole shape in horizontal directional drilling and reaming[J]. Chinese Journal of Underground Space and Engineering, 2018, 14(2): 477-482.(in Chinese)
[19] 来弘鹏,赵 鑫,康 佐.黄土地区新建地铁隧道下穿时既有地铁线路沉降控制标准[J].交通运输工程学报,2018,18(4):63-71.
LAI Hong-peng, ZHAO Xin, KANG Zuo. Settlement control standard of existing metro line undercrossed by new metro tunnel in loess area[J]. Journal of Traffic and Transportation Engineering, 2018, 18(4): 63-71.(in Chinese)
[20] 白永学.富水砂卵石地层盾构施工诱发地层塌陷机理及对策研究[D].成都:西南交通大学,2012.
BAI Yong-xue. Research on ground collapse mechanism of shield tunnelling in saturated sandy pebble stratum and corresponding measures[D]. Chengdu: Southwest Jiaotong University, 2012.(in Chinese)
[21] 潘伟强.软土地区管幕群顶管施工地面沉降监测与分析[J].岩土工程学报,2019,41(增1):201-204.
PAN Wei-qiang. Monitoring and analysis of ground settlement during pipe roof construction of pipe-jacking groups in soft soil areas[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 201-204.(in Chinese)
[22] 黄雅娜,蒋 辉,李 竹,等.天津站铁路下方施工盾构隧道引起的沉降分析[J].建筑科学,2012,28(增1):246-249.
HUANG Ya-na, JIANG Hui, LI Zhu, et al. Settlement analysis of the construction of shield tunnel passing beneath Tianjin Railway Station[J]. Building Science, 2012, 28(S1): 246-249.(in Chinese)
[23] 王国炜,顾士国,刘 琳,等.油气输送管道水平定向钻下穿公路涉路工程技术评价研究[J].路基工程,2021(4):169-172.
WANG Guo-wei, GU Shi-guo, LIU Lin, et al. Research on technical evaluation of horizontal directional drilling undercrossing road of oil and gas transmission pipeline[J]. Subgrade Engineering, 2021(4): 169-172.(in Chinese)
[24] 方 勇,何 川.考虑施工过程的土压平衡式盾构隧道掘进数值分析[J].铁道工程学报,2009,26(11):56-60.
FANG Yong, HE Chuan. Numerical analysis of earth-pressure-balance shield driving considering based on construction course[J]. Journal of Railway Engineering Society, 2009, 26(11): 56-60.(in Chinese)
[25] 蔡 义,张成平,闵 博.邻近上覆空洞浅埋隧道施工引起的地层变形和破坏特征[J].铁道学报,2019,41(9):118-127.
CAI Yi, ZHANG Cheng-ping, MIN Bo. Analysis of ground deformation and failure induced by shallow tunneling with cavity in the overlying strata[J]. Journal of the China Railway Society, 2019, 41(9): 118-127.(in Chinese)
[26] 李文江,王用波,阎伟龙,等.软黏土顶管工后沉降数值模拟与模型试验[J].地下空间与工程学报,2021,17(增2):710-716.
LI Wen-jiang, WANG Yong-bo, YAN Wei-long, et al. Numerical simulation and model test of post construction settlement of soft clay pipe jacking[J]. Chinese Journal of Underground Space and Engineering, 2021, 17(S2): 710-716.(in Chinese)
[27] 姜洪建.超大断面矩形顶管隧道施工引起的地表沉降规律研究[D].郑州:华北水利水电大学,2019.
JIANG Hong-jian. Research on surface settlement law caused by construction of super large section rectangular pipe jacking tunnel[D]. Zhengzhou: North China University of Water Resources and Electric Power, 2019.(in Chinese)
[28] 李曙光.EPB盾构法隧道施工引起的地表沉降分析与数值模拟[D].长沙:中南大学,2006.
LI Shu-guang. Analysis and numerical simulation of ground settlement caused by EPB shield tunnel construction[D]. Changsha: Central South University, 2006.(in Chinese)
[29] 焦 义,梁 禹,冯金勇,等.多因素影响下顶管施工引起土体变形计算研究[J].铁道科学与工程学报,2021,18(1):192-199.
JIAO Yi, LIANG Yu, FENG Jin-yong, et al. Study on soil deformation caused by pipe jacking construction with multi-factor[J]. Journal of Railway Science and Engineering, 2021, 18(1): 192-199.(in Chinese)
[30] 张艳林,曾天成,甘 甜,等.真实复杂地层大直径钢顶管三维数值模拟研究[J].科学技术与工程,2020,20(33):13791-13798.
ZHANG Yan-lin, ZENG Tian-cheng, GAN Tian, et al. Three-dimensional numerical simulation of large-diameter steel pipe jacking in real and complex strata[J]. Science Technology and Engineering, 2020, 20(33): 13791-13798.(in Chinese)

Memo

Memo:
-
Last Update: 2022-06-10