[1] 陈良江,周勇政.我国高速铁路桥梁技术的发展与实践[J].高速铁路技术,2020,11(2):27-32.
CHEN Liang-jiang, ZHOU Yong-zheng. Development and practice of high-speed railway bridge technology in China[J]. High Speed Railway Technology, 2020, 11(2): 27-32.(in Chinese)
[2] 李迎九.千米跨度高速铁路悬索桥建造技术现状与展望[J].中国铁路,2019(9):1-8.
LI Ying-jiu. Current situation and expectation of construction technology for HSR suspension bridge with kilometers span[J]. China Railway, 2019(9): 1-8.(in Chinese)
[3] 李永乐,蔡宪棠,安伟胜,等.大跨度铁路悬索桥结构刚度敏感性研究[J].中国铁道科学,2011,32(4):24-30.
LI Yong-le, CAI Xian-tang, AN Wei-sheng, et al. Study on the sensitivity of the structural stiffness of long-span railway suspension bridge[J]. China Railway Science, 2011, 32(4): 24-30.(in Chinese)
[4] 沈锐利,张 东,唐茂林.大跨度铁路悬索桥合理刚度指标值的探讨[C]∥中国土木工程学会.2012年全国桥梁学术大会论文集.北京:人民交通出版社,2012:223-239.
SHEN Rui-li, ZHANG Dong, TANG Mao-lin. Discussion on rational stiffness index of long-span railway suspension bridge[C]∥Chinese Society of Civil Engineering. Proceedings of 2012 National Bridge and Structure Academic Conference. Beijing: China Communications Press, 2012: 233-239.(in Chinese)
[5] 唐贺强,徐恭义,刘汉顺.悬索桥用于铁路桥梁的可行性分析[J].桥梁建设,2017,47(2):13-18.
TANG He-qiang, XU Gong-yi, LIU Han-shun. Feasibility analysis of applying of suspension bridge type to railway bridges[J]. Bridge Construction, 2017, 47(2): 13-18.(in Chinese)
[6] ZHAI Wan-ming, HAN Zhao-ling, CHEN Zhao-wei, et al. Train-track-bridge dynamic interaction: a state-of-the-art review[J]. Vehicle System Dynamics, 2019, 57(7): 984-1027.
[7] 周智辉,曾庆元.桥上列车脱轨计算分析[J].中国铁道科学,2004,25(4):47-50.
ZHOU Zhi-hui, ZENG Qing-yuan. Computation and analysis of train derailment on bridge[J]. China Railway Science, 2004, 25(4): 47-50.(in Chinese)
[8] DINH V N, KIM K D, WARNITCHAI P. Dynamic analysis of three-dimensional bridge-high-speed train interactions using a wheel-rail contact model[J]. Engineering Structures, 2009, 31(12): 3090-3106.
[9] ANTOLÍN P, ZHANG Nan, GOICOLEA J M, et al.
Consideration of nonlinear wheel-rail contact forces for dynamic vehicle-bridge interaction in high-speed railways[J]. Journal of Sound and Vibration, 2013, 332(5): 1231-1251.
[10] LI Q, XU Y L, WU D J, et al. Computer-aided nonlinear
vehicle-bridge interaction analysis[J]. Journal of Vibration and Control, 2010, 16(12): 1791-1816.
[11] ZHAI Wan-ming. Two simple fast integration methods for
large-scale dynamic problems in engineering[J]. International Journal for Numerical Methods in Engineering, 1996, 39(24): 4199-4214.
[12] ZHAI Wan-ming, XIA He, CAI Cheng-biao, et al. High-speed train-track-bridge dynamic interactions—Part Ⅰ: theoretical model and numerical simulation[J]. International Journal of Rail Transportation, 2013, 1(1/2): 3-24.
[13] 吴定俊,李 奇,陈艾荣.车桥耦合振动迭代求解数值稳定性问题[J].力学季刊,2007,28(3):405-411.
WU Ding-jun, LI Qi, CHEN Ai-rong. Numerical stability of iteration scheme for solution vehicle-bridge coupling vibration[J]. Chinese Quarterly of Mechanics, 2007, 28(3): 405-411.(in Chinese)
[14] ZHU Zhi-hui, GONG Wei, WANG Li-dong, et al. An efficient multi-time-step method for train-track-bridge interaction[J]. Computers and Structures, 2018, 196: 36-48.
[15] 张 楠,夏 禾.基于全过程迭代的车桥耦合动力系统分析方法[J].中国铁道科学,2013,34(5):32-38.
ZHANG Nan, XIA He. A vehicle-bridge interaction dynamic system analysis method based on inter-system iteration[J]. China Railway Science, 2013, 34(5): 32-38.(in Chinese)
[16] YU Zhi-wu, MAO Jian-feng. Probability analysis of train-track-bridge interactions using a random wheel/rail contact model[J]. Engineering Structures, 2017, 144: 120-138.
[17] XIA H, XU Y L, CHAN T H T. Dynamic interaction of long suspension bridges with running trains[J]. Journal of Sound and Vibration, 2000, 237(2): 263-280.
[18] 郭向荣,何 玮,朱志辉,等.横风作用下货物列车通过大跨度铁路斜拉桥的走行安全性研究[J].中国铁道科学,2016,37(2):41-47.
GUO Xiang-rong, HE Wei, ZHU Zhi-hui, et al. Running safety of freight train passing long-span cable-stayed railway bridge under cross wind[J]. China Railway Science, 2016, 37(2): 41-47.(in Chinese)
[19] 韩 艳,夏 禾,郭薇薇.斜拉桥在地震与列车荷载同时作用下的动力响应分析[J].工程力学,2006,23(1):93-98.
HAN Yan, XIA He, GUO Wei-wei. Dynamic response of cable-stayed bridge to running trains and earthquakes[J]. Engineering Mechanics, 2006, 23(1): 93-98.(in Chinese)
[20] GONG Wei, ZHU Zhi-hui, LIU Yu, et al. Running safety assessment of a train traversing a three-tower cable-stayed bridge under spatially varying ground motion[J]. Railway Engineering Science, 2020, 28(2): 184-198.
[21] ZHU Zhi-hui, GONG Wei, WANG Kun, et al. Dynamic effect of heavy-haul train on seismic response of railway cable-stayed bridge[J]. Journal of Central South University, 2020, 27(7): 1939-1955.
[22] 李小珍,秦 羽,刘德军,等.侧风作用下五峰山长江大桥列车行车安全控制[J].铁道工程学报,2018(7):58-64.
LI Xiao-zhen, QIN Yu, LIU De-jun, et al. The safety control of train running on the Wufeng Mountain Yangtze River Bridge under crosswind[J]. Journal of Railway Engineering Society, 2018(7): 58-64.(in Chinese)
[23] 雷虎军,刘 伟,黄炳坤.地震作用下千米级高速铁路悬索桥行车安全性研究[J].振动与冲击,2020,39(10):249-255.
LEI Hu-jun, LIU Wei, HUANG Bing-kun. Running safety of high-speed railway kilometre-level suspension bridge under earthquake[J]. Journal of Vibration and Shock, 2020, 39(10): 249-255.(in Chinese)
[24] YAU J D. Dynamic response analysis of suspended beams
subjected to moving vehicles and multiple support excitations[J]. Journal of Sound and Vibration, 2009, 325(4/5): 907-922.
[25] 谢铠泽,赵维刚,蔡小培,等.悬索桥初始内力与几何非线性对梁轨相互作用的影响[J].交通运输工程学报,2020,20(1):82-91.
XIE Kai-ze, ZHAO Wei-gang, CAI Xiao-pei, et al. Impacts of initial internal force and geometric nonlinearity of suspension bridge on bridge-rail interaction[J]. Journal of Traffic and Transportation Engineering, 2020, 20(1): 82-91.(in Chinese)
[26] 翟婉明,蔡成标,王开云.高速列车-轨道-桥梁动态相互作用原理及模型[J].土木工程学报,2005,38(11):132-137.
ZHAI Wan-ming, CAI Cheng-biao, WANG Kai-yun. Mechanism and model of high-speed train-track-bridge dynamic interaction[J]. China Civil Engineering Journal, 2005, 38(11): 132-137.(in Chinese)
[27] KALKER J J. On the rolling contact of two elastic bodies in the presence of dry friction[D]. Delt: Delt University of Technology, 1967.
[28] VERMEULEN P J, JOHNSON K L. Contact of nonspherical elastic bodies transmitting tangential forces[J]. Journal of Applied Mechanics, 1964, 31(2): 338-340.
[29] NOUR-OMID B, RANKIN C C. Finite rotation analysis and consistent linearization using projectors[J]. Computer Methods in Applied Mechanics and Engineering, 1991, 93(3): 353-384.
[30] ZHU Zhi-hui, GONG Wei, WANG Li-dong, et al. Efficient assessment of 3D train-track-bridge interaction combining multi-time-step method and moving track technique[J]. Engineering Structures, 2019, 183: 290-302.
[31] 杨海洋,钟铁毅,夏 禾.铁路悬索桥纵向非一致激励地震响应分析[J].振动与冲击,2014,33(22):157-163.
YANG Hai-yang, ZHONG Tie-yi, XIA He. Seismic responses analysis of a railway suspension bridge under longitudinal non-uniform excitations[J]. Journal of Vibration and Shock, 2014, 33(22): 157-163.(in Chinese)