|Table of Contents|

Evaluation method of security risk on crowded metro station(PDF)

《交通运输工程学报》[ISSN:1671-1637/CN:61-1369/U]

Issue:
2020年05期
Page:
198-207
Research Field:
交通运输规划与管理
Publishing date:
2020-10-20

Info

Title:
Evaluation method of security risk on crowded metro station
Author(s):
WANG Yi-min12 LUO Yue1 YU Heng1 CHEN Jia-cheng3 HUANG Xin1
1. School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510640, Guangdong, China; 2. State Key Laboratory of Subtropical Building Science, South China University of Technology, Guangzhou 510640, Guangdong, China; 3. Guangzhou Metro Group Co., Ltd., Guangzhou 510335, Guangdong, China
Keywords:
urban rail transit metro station security risk evaluation extension theory maximum correlation degree crowded multi-factor evaluation system field application
PACS:
U491.17
DOI:
10.19818/j.cnki.1671-1637.2020.05.016
Abstract:
In order to accurately evaluate the security situation of crowded metro station, the security risk factors of crowded metro station were identified and analyzed on the basis of considering the subjective and objective hazard sources through literature search, case collection and questionnaire. A 4-level security evaluation system with 55 indicators was established. The risk types included fire, stampede, terrorist attack, flood, earthquake and so on. The calculating method of indicator weights at all levels, the acquisition method of indicators scores, the types of security grade and the indicators score ranges were clarified. Based on the extension theory, the security score calculation method of four-level risk indicators and the security risk grade judging criteria and evaluation method of crowded metro station were established. The security evaluation method was programmed and calculated by using MATLAB. The Tiyuxilu Station of Guangzhou Metro Line 3 was evaluated rapidly. Calculation result shows that the correlation matrix between the first-level security indicator and each security level of Tiyuxilu Station is(-0.057 6, -0.462 4, -0.588 2, -0.628 1)T, and the correlation matrix between the stampede accident of second-level indicator and each security level is(-0.354 8, -0.741 5, -0.724 5, -0.690 4, -186 5)T. According to the principle of maximum correlation degree, Tiyuxilu Station is generally in a safe state, but there are potential security hazards in congestion/stampede accident, evacuation environment, and management countermeasures, so the good operational security risk control measures of the station can reduce the impact of unsafe factors. The evaluation method is conducive to accurately understand the security situation of metro station, timely discover the potential security hazards, and formulate the countermeasures to ensure the safe operation of metro station. 5 tabs, 15 figs, 30 refs.

References:

[1] 中国城市轨道交通协会.城市轨道交通2019年度统计和分析报告[R].北京:中国城市轨道交通协会,2020. China Association of Metros. Statistical and analytical report of urban rail transit in 2019[R]. Beijing: China Association of Metros, 2020.(in Chinese)
[2] SHI Cong-ling, ZHONG Mao-hua, NONG Xing-zhong, et al. Modeling and safety strategy of passenger evacuation in a metro station in China[J]. Safety Science, 2012, 50(5): 1319-1332.
[3] HE Lin, LIANG Qiang-sheng, FANG Si-yuan. Challenges and innovative solutions in urban rail transit network operations and management: China's Guangzhou metro experience[J]. Urban Rail Transit, 2016, 2(1): 33-45.
[4] LEI Wen-jun, LI An-gui, GAO Ran, et al. Simulation of pedestrian crowds' evacuation in a huge transit terminal subway station[J]. Physica A: Statistical Mechanics and its Applications, 2012, 391(22): 5355-5365.
[5] MOOFIE K. The king's cross fire: damage assessment and overview of the technical investigation[J]. Fire Safety Journal, 1992, 18(1): 13-33.
[6] LI Yue, WU Yu-zhe. Research on the impact of crisis events on urban development—a case study of Kunming railway station terrorist attack[C]∥Springer.Proceedings of the 20th international symposium on advancement of construction management and real estate. Berlin: Springer, 2017: 139-144.
[7] XIE Ke-fan, MEI Yan-lan, GUI Ping, et al. Early-warning analysis of crowd stampede in metro station commercial area based on internet of things[J]. Multimedia Tools and Applications, 2019, 78(21): 30141-30157.
[8] GONZVA M, BARROCA B, GAUTIER P E, et al. Modeling disruptions causing domino effects in urban guided transport systems faced by flood hazards[J]. Natural Hazards, 2017, 86(1): 183-201.
[9] HASHASH Y M A, HOOK J J, SCHMIDT B, et al. Seismic design and analysis of underground structures[J]. Tunnelling and Underground Space Technology, 2001, 16(4): 247-293.
[10] ALKHADIM M, GIDADO K, NOEL P. Risk management: the effect of FIST on perceived safety in crowded large space buildings[J]. Safety Science, 2018, 108: 29-38.
[11] LI Wen-hang, GONG Jian-hua, YU Ping, et al. Simulation and analysis of congestion risk during escalator transfers using a modified social force model[J]. Physica A: Statistical Mechanics and its Applications, 2015, 420: 28-40.
[12] LI Wen-hang, GONG Jian-hua, YU Ping, et al. Simulation and analysis of individual trampling risk during escalator transfers[J]. Physica A: Statistical Mechanics and its Applications, 2014, 408: 119-133.
[13] LI Wen-hang, GONG Jian-hua, YU Ping, et al. Modeling, simulation and analysis of group trampling risks during escalator transfers[J]. Physica A: Statistical Mechanics and its Applications, 2016, 444: 970-984.
[14] 寇丽平.人员密集场所风险评估理论与标准化方法研究[D].北京:中国地质大学,2008. KOU Li-ping. Study on risk assessment theory and standardization method of assembly occupancies[D]. Beijing: China University of Geosciences, 2008.(in Chinese)
[15] 王亚飞,朱 伟,马英楠.人员密集场所风险定量分级模型研究[J].中国安全生产科学术,2019,15(S1):68-72. WANG Ya-fei, ZHU Wei, MA Ying-nan.Study on the quantitative risk ranking model of crowded places[J]. Journal of Safety Science and Technology, 2019, 15(S1): 68-72.(in Chinese)
[16] CHENG Ze-yang, LU Jian, ZHAO Yi. Pedestrian evacuation risk assessment of subway station under large-scale sport activity[J]. International Journal of Environmental Research and Public Health, 2020, 17(11): 1-15.
[17] WANG Qi-quan. Subway crowded and stampede neural networks safety assessment basing on SHEL model[C]∥Springer. Man-Machine-Environment System Engineering. Berlin: Springer, 2016: 455-468.
[18] 陆 莹,李启明,高 原.基于案例推理的地铁运营安全事故案例库构建[J].东南大学学报(自然科学版),2015,45(5):990-995. LU Ying, LI Qi-ming, GAO Yuan. Construction of accident case database for subway operation based on case-based reasoning[J]. Journal of Southeast University(Natural Science Edition), 2015, 45(5): 990-995.(in Chinese)
[19] 任 刚,陈佳洁,高瑾瑶,等.基于改进可拓物元法的地铁车站运营安全评价方法[J].城市轨道交通研究,2020,23(3):136-139. REN Gang, CHEN Jia-jie, GAO Jin-yao, et al. Safety assessment of metro station operation based on improved extension and matter element method[J]. Urban Mass Transit, 2020, 23(3): 136-139.(in Chinese)
[20] 代齐齐.基于可拓学理论的地铁运营安全评价研究[D].成都:西南交通大学,2013. DAI Qi-qi. Study on safety evaluation of subway operation based on extenics theory[D]. Chengdu: Southwest Jiaotong University, 2013.(in Chinese)
[21] 赖克光.地铁消防安全评估模型及应用研究[D].广州:华南理工大学, 2013. LAI Ke-guang. Research on the evaluation model and application of subway fire safety[D]. Guangzhou: South China University of Technology, 2013.(in Chinese)
[22] 欧 雯.恐怖袭击下城市轨道交通网络抗毁性分析[D].成都:西南交通大学,2014. OU Wen. Analysis of the urban rail transit network survivability under the terrorist attacks[D]. Chengdu: Southwest Jiaotong University, 2014.(in Chinese)
[23] 黄 超,殷建国,张 军,等.层次分析法计算风险评估指标权重[J].中国公共安全(学术版),2018,51(2):19-22. HUANG Chao, YIN Jian-guo, ZHANG Jun, et al. Calculation of risk assessment index weight by analytic hierarchy process[J]. China Public Security(Academy Edition), 2018, 51(2): 19-22.(in Chinese)
[24] 郭 湛,商小雷,李 海.基于AHP的轨道交通安全评价体系模型[J].中国铁道科学,2011,32(3):123-125. GUO Zhan, SHANG Xiao-lei, LI Hai. AHP-based safety assessment model for rail transit system[J]. China Railway Science, 2011, 32(3): 123-125.(in Chinese)
[25] 骆正清,杨善林.层次分析法中几种标度的比较[J].系统工程理论与实践,2004(9):51-60. LUO Zheng-qing, YANG Shan-lin. Comparative study on several scales in AHP[J]. Systems Engineering—Theory and Practice, 2004(9): 51-60.(in Chinese)
[26] YU Heng, WANG Yi-min, QIU Pei-yun, et al. Analysis of natural and man-made accidents happened in subway stations and trains: based on statistics of accident cases[J]. MATEC Web of Conferences, 2019, 272: 1-10.
[27] SAATY T L. How to make a decision: the analytic hierarchy process[J]. European Journal of Operational Research, 1990, 48(1): 9-26.
[28] 于 恒,汪益敏,仇培云.基于可拓理论的地铁车站多风险因素安全评价体系[J].交通工程,2019,19(2):72-78. YU Heng,WANG Yi-min,QIU Pei-yun. Multi-risk factor safety evaluation system for metro stations based on extension theory[J]. Journal of Transportation Engineering, 2019, 19(2): 72-78.(in Chinese)
[29] 蔡 文,杨春燕.可拓学的基础理论与方法体系[J].科学通报,2013,58(13):1190-1199. CAI Wen, YANG Chun-yan. Basic theory and methodology on extenics[J]. Chinese Science Bulletin, 2013, 58(13): 1190-1199.(in Chinese)
[30] 杨春燕,张拥军,蔡 文.可拓集合及其应用研究[J].数学的实践与认识,2002,32(2):301-308. YANG Chun-yan, ZHANG Yong-jun, CAI Wen. Study on extension set and its applications[J]. Mathematics in Practice and Theory, 2002, 32(2): 301-308.(in Chinese)

Memo

Memo:
-
Last Update: 2020-10-20