[1] 戴公连,葛 浩,刘文硕,等.实测温度下大跨度桥上纵连无砟轨道受力研究[J].铁道工程学报,2017,34(5):26-31,93.
DAI Gong-lian, GE Hao, LIU Wen-shuo, et al. Analysis of longitudinally connected ballastless track on the high-speed railway long-span bridge based on the actual measured temperature[J]. Journal of Railway Engineering Society, 2017, 34(5): 26-31, 93.(in Chinese)
[2] 蔡小培,高 亮,孙汉武,等.桥上纵连板式无砟轨道无缝线路力学性能分析[J].中国铁道科学,2011,32(6):28-33.
CAI Xiao-pei, GAO Liang, SUN Han-wu, et al. Analysis on the mechanical properties of longitudinally connected ballastless track continuously welded rail on bridge[J]. China Railway Science, 2011, 32(6): 28-33.(in Chinese)
[3] 陈 嵘,邢 俊,谢铠泽,等.温度荷载下纵连式无砟轨道梁轨耦合作用规律[J].铁道工程学报,2017,34(3):15-21.
CHEN Rong, XING Jun, XIE Kai-ze, et al. The continuous-slab-track coupling laws between the bridge and track under temperature loads[J]. Journal of Railway Engineering Society, 2017, 34(3): 15-21.(in Chinese)
[4] 潘 鹏.制动荷载作用下桥上无砟轨道动力特性分析[D].南昌:华东交通大学,2017.
PAN Peng. Dynamic characteristics analysis of ballastless track on bridge under braking load[D]. Nanchang: East China Jiaotong University, 2017.(in Chinese)
[5] CHEN Bo-jing, CAI Xiao-pei, SHI Xiao-bo. Study on mechanical properties and field monitoring of ballastless CWR on the bridge in high-speed railway[J]. Applied Mechanics and Materials, 2013, 361-363: 1449-1454.
[6] 徐庆元,张旭久.高速铁路博格纵连板桥上无砟轨道纵向力学特性[J].中南大学学报(自然科学版),2009,40(2):526-532.
XU Qing-yuan, ZHANG Xu-jiu. Longitudinal forces characteristics of Bogl longitudinal connected ballastless track on high-speed railway bridge[J]. Journal of Central South University(Science and Technology), 2009, 40(2): 526-532.(in Chinese)
[7] 吴青松,任娟娟,刘学毅,等.用于铺设Ⅱ型板式轨道的大跨连续梁桥合理温度跨度研究[J].铁道科学与工程学报,2016,13(3):414-422.
WU Qing-song, REN Juan-juan, LIU Xue-yi, et al. Research on the critical expansion length of large span continuous beam bridge for CRTS Ⅱ slab track[J]. Journal of Railway Science and Engineering, 2016, 13(3): 414-422.(in Chinese)
[8] 李秋义,孙 立.桥墩温差荷载引起的桥上无缝线路钢轨附加力[J].中国铁道科学,2007,28(4):50-54.
LI Qiu-yi, SUN Li. Additional longitudinal force of CWR track on bridge caused by temperature difference between one side and another side of pier[J]. China Railway Science, 2007, 28(4): 50-54.(in Chinese)
[9] 赵国堂,高 亮,赵 磊,等.CRTS Ⅱ型板式无砟轨道板下离缝动力影响分析及运营评估[J].铁道学报,2017,39(1):1-10.
ZHAO Guo-tang, GAO Liang, ZHAO Lei, et al. Analysis of dynamic effect of gap under CRTS Ⅱtrack slab and operation evaluation[J]. Journal of the China Railway Society, 2017, 39(1): 1-10.(in Chinese)
[10] 魏 强,赵国堂,蔡小培.CRTS Ⅱ型板式轨道台后锚固结构研究[J].铁道学报,2013,35(7):90-95.
WEI Qiang, ZHAO Guo-tang, CAI Xiao-pei. Study on anchor structure behind the abutment for slab track CRTS Ⅱ[J]. Journal of the China Railway Society, 2013, 35(7): 90-95.(in Chinese)
[11] 王继军,江 成,赵 磊,等.高铁单元板式无砟轨道大跨梁端适应性对比[J].铁道工程学报,2018,35(5):18-23,87.
WANG Ji-jun, JIANG Cheng, ZHAO Lei, et al. The adaptive contrast research on the slab track of high-speed railway in long span bridge end[J]. Journal of Railway Engineering Society, 2018, 35(5): 18-23, 87.(in Chinese)
[12] 谢铠泽,王 平,徐井芒,等.桥上单元板式无砟轨道无缝线路的适应性[J].西南交通大学学报,2014,49(4):649-655.
XIE Kai-ze, WANG Ping, XU Jing-mang, et al. Adaptability of continuous welded rail of unit slab non-ballast track on bridges[J]. Journal of Southwest Jiaotong University, 2014, 49(4): 649-655.(in Chinese)
[13] DAI Gong-lian, LIU Wen-shuo. Applicability of small resistance fastener on long-span continuous bridges of high-speed railway[J]. Journal of Central South University, 2013, 20(5): 1426-1433.
[14] YAN Bin, DAI Gong-lian, GUO Wen-hua, et al. Longitudinal force in continuously welded rail on long-span tied arch continuous bridge carrying multiple tracks[J]. Journal of Central South University, 2015, 22(5): 2001-2006.
[15] PAPP H, LIEGNER N. Investigation of internal forces in the rail due to the interaction of CWR tracks and steel railway bridges with ballasted track superstructure[J]. Pollack Periodica, 2016, 11(2): 65-74.
[16] DAI Gong-lian, YAN Bin. Longitudinal forces of continuously welded track on high-speed railway cable-stayed bridge considering impact of adjacent bridges[J]. Journal of Central South University, 2012, 19(8): 2348-2353.
[17] 高碧波.高墩大跨度连续刚构温度场与温度荷载模式试验研究[D].上海:同济大学,2008.
GAO Bi-bo. The study on temperature field and mode of temperature gradient of continuous rigid frame bridge with high piers and long spans[D]. Shanghai: Tongji University, 2008.(in Chinese)
[18] 张运波.薄壁空心高墩的温度效应及其对稳定性影响的研究[D].北京:中国铁道科学研究院,2011.
ZHANG Yun-bo. Studies on temperature effects and its influence on stability for high pier with thin-walled hollow sections[D]. Beijing: China Academy of Railway Sciences, 2011.(in Chinese)
[19] 刘 舟.收缩徐变和日照温差对高铁连续梁桥梁轨纵向力影响研究[D].长沙:中南大学,2012.
LIU Zhou. Track-bridge longitudinal force of continuous bridge on high-speed railway with the shrinkage and creep and sunshine temperature difference[D]. Changsha: Central South University, 2012.(in Chinese)
[20] XIE Kai-ze, XING Jun, WANG Li, et al. Effect of temperature difference load of 32 m simply supported box beam bridge on track vertical irregularity[J]. Journal of Modern Transportation, 2015, 23(4): 262-271.
[21] CHEN Zui, XIAO Jie-ling, LIU Xiao-kai, et al. Effects of initial up-warp deformation on the stability of the CRTS Ⅱ slab track at high temperatures[J]. Journal of Zhejiang University—Science A(Applied Physics and Engineering), 2018, 19(12): 939-950.
[22] SONG Xiao-lin, ZHAO Chun-fa, ZHU Xiao-jia. Temperature-induced deformation of CRTS Ⅱ slab track and its effect on track dynamical properties[J]. Science China(Technological Sciences), 2014, 57(10): 1917-1924.
[23] LOU Ping, ZHU Jun-pu, DAI Gong-lian, et al. Experimental study on bridge-track system temperature actions for Chinese high-speed railway[J]. Archives of Civil and Mechanical Engineering, 2018, 18(2): 451-464.
[24] 刘婷林,代先星,肖杰灵,等.温度梯度对高墩桥上无缝线路的影响分析[J].铁道建筑,2014(4):121-124.
LIU Ting-lin, DAI Xian-xing, XIAO Jie-ling, et al. Analysis of the effect of temperature gradient on CWR on high pier bridge[J]. Railway Engineering, 2014(4): 121-124.(in Chinese)
[25] 张亚爽,胡志鹏,马旭峰,等.高墩水平温差对连续刚构桥上无缝线路的影响[J].铁道标准设计,2014,58(11):20-23,27.
ZHANG Ya-shuang, HU Zhi-peng, MA Xu-feng, et al. The influence of high piers with horizontal temperature difference on CWR on the continuous rigid frame bridge[J]. Railway Standard Design, 2014, 58(11): 20-23, 27.(in Chinese)
[26] 罗华朋,马旭峰,肖杰灵,等.桥墩温度荷载对高墩大跨桥上无砟轨道无缝线路的影响研究[J].铁道建筑,2015(6):127-131.
LUO Hua-peng, MA Xu-feng, XIAO Jie-ling, et al. Study on the effect of pier temperature load on CWR of ballastless track on long-span bridge with high piers[J]. Railway Engineering, 2015(6): 127-131.(in Chinese)
[27] 罗华朋,邢 俊,杨 凯,等.桥墩温度梯度对高墩大跨桥上无砟轨道影响研究[J].铁道标准设计,2015,59(8):26-29.
LUO Hua-peng, XING Jun, YANG Kai, et al. Effects of pier temperature gradient on ballastless track of long-span bridge[J]. Railway Standard Design, 2015, 59(8): 26-29.(in Chinese)
[28] 戴公连,唐 宇,梁金宝.高速铁路高墩极值温度变形研究[J].铁道学报,2018,40(7):109-114.
DAI Gong-lian, TANG Yu, LIANG Jin-bao. Study on extreme temperature deformation of tall-pier for high-speed railway[J]. Journal of the China Railway Society, 2018, 40(7): 109-114.(in Chinese)
[29] 张鹏飞,桂 昊,高 亮,等.桥上CRTS Ⅱ型板式无砟轨道制动力影响因素分析[J].铁道工程学报,2018,35(7):30-35,108.
ZHANG Peng-fei, GUI Hao, GAO Liang, et al. Analysis of influencing factors of braking force of CRTS Ⅱ slab track on bridge[J]. Journal of Railway Engineering Society, 2018, 35(7): 30-35, 108.(in Chinese)
[30] 刘 成,李 帅,谢铠泽,等.纵连板式轨道在墩台位移作用下梁轨相互作用规律研究[J].铁道标准设计,2016,60(12):8-12.
LIU Cheng, LI Shuai, XIE Kai-ze, et al. Beam and track interaction of continuous-slab-track subject to pier displacement[J]. Railway Standard Design, 2016, 60(12): 8-12.(in Chinese)
[31] 田仲初,曹少辉,张 恒,等.温度对空心薄壁高墩垂直度的影响分析[J].公路与汽运,2010(5):125-128.
TIAN Zhong-chu, CAO Shao-hui, ZHANG Heng, et al. Analysis of the effect of temperature on verticality of hollow thin-walled high piers[J]. Highways and Automotive Applications, 2010(5): 125-128.(in Chinese)