[1] BAANT Z P, YU Q, LI G H. Excessive long-time deflections of prestressed box girders. Ⅰ: record-span bridge in Palau and other paradigms[J]. Journal of Structural Engineering, 2012, 138(6): 676-686.
[2] ROBERTSON I N. Prediction of vertical deflections for a
long-span prestressed concrete bridge structure[J]. Engineering Structures, 2005, 27(12): 1820-1827.
[3] TAKÁCS P F. Deformations in concrete cantilever bridges: observations and theoretical modeling[D]. Trondheim: The Norwegian University of Science and Technology, 2002.
[4] 付 丹.预应力锚索工作应力的检测方法研究[D].北京:清华大学,2010.
FU Dan. Working stress tests of prestressed tendons in ground anchorage[D]. Beijing: Tsinghua University, 2010.(in Chinese)
[5] 付 丹,郭红仙,程晓辉,等.预应力锚索工作应力的检测方法——拉脱法的检测机制和试验研究[J].岩土力学,2012,33(8):2247-2252.
FU Dan, GUO Hong-xian, CHENG Xiao-hui, et al. Working stress measurement of prestressed anchor cables: detection mechanism and experimental study of lift-off test[J]. Rock and Soil Mechanics, 2012, 33(8): 2247-2252.(in Chinese)
[6] 詹桂超,刘冠之.基于拉脱法的预应力钢绞线张拉力测试分析[J].公路与汽运,2016(3):191-193.
ZHAN Gui-chao, LIU Guan-zhi. Test and analysis on prestressed steel strand tension test based on lift-off method[J]. Highways and Automotive Applications, 2016(3): 191-193.(in Chinese)
[7] 赵 煜,洪路加,周勇军.基于钢束应力测试的预应力混凝土箱梁承载力评估方法[J].长安大学学报(自然科学版),2019,39(1):61-69.
ZHAO Yu, HONG Lu-jia, ZHOU Yong-jun. Bearing capacity assessment method for PC box girder by testing stress of tendon[J] Journal of Chang'an University(Natural Science Edition), 2019, 39(1): 61-69.(in Chinese)
[8] 李瑞鸽.全预应力梁预应力损失的动力检测研究[D].武汉:华中科技大学,2005.
LI Rui-ge. Prestress loss of full prestressed concrete beams by dynamic technology[D]. Wuhan: Huazhong University of Science and Technology, 2015.(in Chinese)
[9] 艾辉林,陈朝慰,戴文达.预应力梁锚下有效预应力的快速检测方法研究[J].世界桥梁,2015,43(4):42-46.
AI Hui-lin, CHEN Chao-wei, DAI Wen-da. Study of rapid inspection method for under-anchorage effective prestress in prestressed beams[J]. World Bridges, 2015, 43(4): 42-46.(in Chinese)
[10] 喻国强.预应力混凝土桥梁有效预应力测试技术应用[D].西安:长安大学,2013.
YU Guo-qiang. The application of prestressed concrete bridge effective prestressed testing technology[J]. Xi'an: Chang'an University, 2013.(in Chinese)
[11] 杨国立,李瑞鸽.预应力混凝土梁中预应力损失检测方法的发展与展望[J].四川建筑科学研究,2008,34(4):113-116.
YANG Guo-li, LI Rui-ge. Development and prospect of prestress loss detection in prestressed concrete beams[J]. Sichuan Building Science, 2008, 34(4): 113-116.(in Chinese)
[12] 郭 琦.复杂预应力体系梁式结构有效预应力预测理论与方法研究[D].西安:长安大学,2008.
GUO Qi. Theory and method of effective prestress prediction of beam prestressed composite prestressed system[D]. Xi'an: Chang'an University, 2008.(in Chinese)
[13] XU Jiang, WU Xin-jun, SUN Peng-fei. Detecting broken-wire flaws at multiple locations in the same wire of prestressing strands using guided waves[J]. Ultrasonics, 2013, 53(1): 150-156.
[14] CHEN R H L, WISSAWAPAISAL K. An ultrasonic method
for measuring tensile forces in a seven-wire prestressing strand[J]. AIP Conference Proceedings, 2002, 615(1): 1295-1302.
[15] 张奔牛,袁 灿,陈卓敏,等.基于LC振荡的钢绞线应力测量研究[J].重庆交通大学学报(自然科学版),2017,36(3):8-12.
ZHANG Ben-niu, YUAN Can, CHEN Zhuo-min, et al. Stress measurement of steel strands based on LC oscillation[J]. Journal of Chongqing Jiaotong University(Natural Science), 2017, 36(3): 8-12.(in Chinese)
[16] 贾巧燕.基于应力释放法的在役混凝土结构现存预应力确定研究[D].武汉:武汉理工大学,2008.
JIA Qiao-yan. Study on the extant pre-stressed force of the concrete structure in service based on the stress release method[D]. Wuhan: Wuhan University of Technology, 2008.(in Chinese)
[17] 欧进萍,周 智,王 勃.FRP-OFBG智能复合筋及其在加筋混凝土梁中的应用[J].高技术通讯,2005,15(4):23-28.
OU Jin-ping, ZHOU Zhi, WANG Bo. Smart FRP-OFBG bars and their application in reinforced concrete beams[J]. Chinese High Technology Letters, 2005, 15(4): 23-28.(in Chinese)
[18] 周 智,武湛君,赵雪峰,等.混凝土结构的光纤光栅智能监测技术[J].功能材料,2003,34(3):344-348.
ZHOU Zhi, WU Zhan-jun, ZHAO Xue-feng, et al. Smart monitoring technique of concrete structures based on optical fiber Bragg grating sensors[J]. Journal of Functional Materials, 2003, 34(3): 344-348.(in Chinese)
[19] 贺拴海,赵祥模,马 建,等.公路桥梁检测及评价技术综述[J].中国公路学报,2017,30(11):63-80.
HE Shuan-hai, ZHAO Xiang-mo, MA Jian, et al. Review of highway bridge inspection and condition assessment[J]. China Journal of Highway and Transport, 2017, 30(11): 63-80.(in Chinese)
[20] 钟正强,戴 典,袁建伟.基于虎克定理的预应力检测系统开发及应用[J].中南大学学报(自然科学版),2018,49(3):725-731.
ZHONG Zheng-qiang, DAI Dian, YUAN Jian-wei. Development and application of prestress testing system based on Hooke theorem[J]. Journal of Central South University(Science and Technology), 2018, 49(3): 725-731.(in Chinese)
[21] 董 雁,刘佳琪,张 峰.锚下有效预应力检测仪器研发及工程应用[J].中外公路,2017,37(5):117-120.
DONG Yan, LIU Jia-qi, ZHANG Feng. Instrument development and engineering application of effective prestressing test under anchor[J]. Journal of China and Foreign Highway, 2017, 37(5): 117-120.(in Chinese)
[22] 罗 斌,唐树名,程晓辉,等.锚下预应力反拉检测技术[J].公路交通技术,2012(1):12-14,22.
LUO Bin, TANG Shu-ming, CHENG Xiao-hui, et al. Techniques of reverse drawing detection for prestress under anchor[J]. Technology of Highway and Transport, 2012(1): 12-14, 22.(in Chinese)
[23] 夏 静,袁建伟.反拉法锚下有效预应力检测方法研究[J].公路与汽运,2016(6):210-212.
XIA Jing, YUAN Jian-wei.Research on detection method of effective prestress under anchor by lift-off method[J]. Highways and Automotive Applications, 2016(6): 210-212.(in Chinese)
[24] 成剑波,姚 晨,张 峰.反拉法检测预应力钢绞线工作应力的模型试验研究[J].公路与汽运,2015(3):181-184.
CHENG Jian-bo, YAO Chen, ZHANG Feng. Experimental study of lift-off method for detecting service stress of prestressed strand[J]. Highways and Automotive Applications, 2015(3): 181-184.(in Chinese)
[25] 任传亭,刘伟超,凌天清,等.有效预应力不均匀度初探[J].公路交通技术,2015(6):63-67,72.
REN Chuan-ting, LIU Wei-chao, LING Tian-qing, et al. Primary investigation for unevenness of effective prestress[J]. Technology of Highway and Transport, 2015(6): 63-67, 72.(in Chinese)
[26] 吴玉财,张国炳,李 芬.预应力锚索拉拔力检测技术研究[J].交通科技,2006(5):36-37,59.
WU Yu-cai, ZHANG Guo-bing, LI Fen. Prestressing steel wire drawing force testing technology[J]. Transportation Science and Technology, 2006(5): 36-37, 59.(in Chinese)
[27] 韩 侃,李登科,吴冠仲.预应力锚索锚固力拉拔试验分析[J].岩土工程学报,2011,33(增1):385-387.
HAN Kan, LI Deng-ke, WU Guan-zhong. Pull-out tests on anchoring force of prestressed anchor cables[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(S1): 385-387.(in Chinese)
[28] 张 峰,高 磊,徐向锋,等.施工期钢绞线锚下有效预应力测试技术[J].东北大学学报(自然科学版),2017,38(8):1201-1205.
ZHANG Feng, GAO Lei, XU Xiang-feng, et al. Testing technology of under-anchorage effective prestress of steel strand in construction period[J]. Journal of Northeastern University(Natural Science), 2017, 38(8): 1201-1205.(in Chinese)
[29] 张 峰,高 磊,韩福洲.预应力钢绞线夹片式锚具咬合力试验[J].应用基础与工程科学学报,2017,25(6):1273-1281.
ZHAGN Feng, GAO Lei, HAN Fu-zhou. Experiment on bite force of prestressed steel wire clip-type anchors[J]. Journal of Basic Science and Engineering, 2017, 25(6): 1273-1281.(in Chinese)
[30] 孔庆华,王四玲,谢 强.夹片式单孔预应力锚具的结构分析[J].精密制造与自动化,2005(3):10-11.
KONG Qing-hua, WANG Si-ling, XIE Qiang. Structure analysis of wedge type single hole prestressed anchor[J]. Grinder and Grinding, 2005(3): 10-11.(in Chinese)
[31] 冯天鹏,王 栋,韩福洲,等.预应力孔道摩阻系数测试新技术[J].施工技术,2017,46(9):39-42.
FENG Tian-peng, WANG Dong, HAN Fu-zhou, et al. New testing technology for friction coefficient of prestressed duct[J]. Construction Technology, 2017, 46(9): 39-42.(in Chinese)
[32] 时南翔.预应力锚固系统的检测与监控[J].重庆建筑大学学报,2002,24(2):43-46.
SHI Nan-xiang. Inspection and monitoring of prestressed anchoring system[J]. Journal of Chongqing Jianzhu University, 2002, 24(2): 43-46.(in Chinese)