|Table of Contents|

Security calculation method of steel sheet pile cofferdam based on incremental method(PDF)

《交通运输工程学报》[ISSN:1671-1637/CN:61-1369/U]

Issue:
2016年06期
Page:
39-47
Research Field:
道路与铁道工程
Publishing date:
2016-12-20

Info

Title:
Security calculation method of steel sheet pile cofferdam based on incremental method
Author(s):
DAI Liang-jun12 ZHU Da-yong1
1. School of Civil Engineering, Hefei University of Technology, Hefei 230001, Anhui, China; 2. Anhui Construction Engineering Group, Hefei 230022, Anhui, China
Keywords:
bridge engineering steel sheet pile cofferdam safety of structure incremental method stability safety
PACS:
U443.162
DOI:
-
Abstract:
The existing calculation theories of steel sheet pile were analyzed, and the soil pressure hydrostatic pressure, flowing water pressure, wave pressure and supporting pressure acting on steel sheet pile cofferdam were calculated. The construction process of steel sheet pile cofferdam was analyzed, the steel sheet pile was taken as nonlinear elastic foundation beam, the nonlinear differential equations of elastic foundation beam were established based on the incremental method, the horizontal resistance coefficient of foundation soil, the bending deformation coefficient of steel sheet pile and the increments of internal and external loads of steel sheet pile cofferdam were calculated, and the forces and deformations of steel sheet pile under all conditions were studied. Based on the steel sheet pile cofferdam of Yuxi River Bridge, the internal force, deformation, strength, overall stability, anti-overturning safety, anti-uplift safety of steel sheet pile cofferdam were checked. Calculation result shows that the maximum displacement is 38.12 mm and less than the specification value of 80 mm; the maximum allowable stress of steel sheet pile is 168.60 MPa and less than the specification value of 218.52 MPa; the maximum allowable stress of pipe pile is 112.29 MPa and less than the specification value of 174.07 MPa; the overall stability safety factor of steel sheet pile cofferdam is 2.8 and greater than the specification value of 1.3; the anti-overturning safety factors under 4 cases are 3.4, 2.8, 2.9, 1.9 respectively and greater than the specification value of 1.2; the anti-uplift safety coefficients based on Prandtl theory and Terzaghi theory are 3.1, 3.5 respectively and greater than the specification value of 1.6. Obviously, the safety calculation results of steel sheet pile cofferdam based on the incremental method meet the requirements of the relevant specification, so the calculation method is reasonable and reliable. 4 tabs, 11 figs, 30 refs.

References:

[1] ALBANO M, MODONI G, CROCE P, et al. Assessment of the seismic performance of a bituminous faced rockfill dam[J]. Soil Dynamics and Earthquake Engineering, 2015, 75: 183-198.
[2] 王学武,党发宁,蒋 力,等.深厚复杂覆盖层上高土石围堰三维渗透稳定性分析[J].水利学报,2010,41(9):1074-1086.
WANG Xue-wu, DANG Fa-ning, JIANG Li, et al. Three-dimensional seepage stability analysis of high earth-rock cofferdam built on complex layer of deep coverage[J]. Shuili Xuebao, 2010, 41(9): 1074-1086.(in Chinese)
[3] HU Zhi-gen, FAN Xie, HUAI Wen-xin, et al. Coupling effect between reliability of bedding layer and stability of downstream concrete slab of overflow earth-rock cofferdam[J]. Journal of Hydrodynamics, 2007, 19(5): 613-622.
[4] 袁 帅,何蕴龙,曹学兴.非稳定渗流对托巴土石围堰上游坡稳定性影响[J].武汉大学学报:工学版,2012,45(2):193-199.
YUAN Shuai, HE Yun-long, CAO Xue-xing. Influence of unsteady seepage on upstream slope stability of Tuoba earth-rock cofferdam[J]. Engineering Journal of Wuhan University: Engineering and Technology Edition, 2012, 45(2): 193-199.(in Chinese)
[5] ISOBE K, KIMURA M, OHTSUKA S. Design approach to a method for reinforcing existing caisson foundations using steel pipe sheet piles[J]. Soils and Foundations, 2014, 54(2): 141-154.
[6] KIMURA M, INAZUMI S, TOO J K A, et al. Development and application of H-joint steel pipe sheet piles in construction of foundations for structures[J]. Soils and Foundations, 2007, 47(2): 237-251.
[7] 刘 涛.观音岩长江大桥桥墩钢围堰起吊[J].筑路机械与施工机械化,2010,27(8):63-65.
LIU Tao. Lifting of steel cofferdam for pier of guanyinyan yangtze river bridge[J]. Road Machinery and Construction Mechanization, 2010, 27(8): 63-65.(in Chinese)
[8] 尹 骥,魏建华,李象范.计算复合土钉支护变形的增量方法[J].岩土工程学报,2007,29(5):755-759.
YIN Ji, WEI Jian-hua, LI Xiang-fan. Increment method to calculate dispalcement of composite soil nailled wall[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(5): 755-759.(in Chinese)
[9] 邓子胜.深基坑支护结构——土非线性共同作用弹性地基反力法[J].土木工程学报,2006,39(4):68-72.
DENG Zi-sheng. An elastic subgrade reaction method considering nonlinear interaction between protection-structure and soil for deep excavations[J]. China Civil Engineering Journal, 2006, 39(4): 68-72.(in Chinese)
[10] XIE Jin-rong, LI Ba-tong, CHEN Pi-hui, et al. Optimized design of larsen steel sheet pile supporting structure based on parameter sensitivity[J]. Applied Mechanics and Materials, 2014, 501-504: 770-776.
[11] 李仁民,杨文俊.深基坑浅嵌固钢板桩在红砂岩地质中的设计与应用[J].岩土工程学报,2010,32(增1):493-498.
LI Ren-min,YANG Wen-jun. Design and application of lightly mounted steel sheet piles for deep foundation pits in red sandstone[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 493-498.(in Chinese)
[12] GUI Jin-song, FU Yu, BI E K. The numerical calculation
based on ABAQUS of lattice type steel sheet pile wharf structure[J]. Applied Mechanics and Materials, 2014, 501-504: 2107-2111.
[13] BYFIELD M P, MAWER R W. Analysis of reduced modulus
action in U-section steel sheet piles[J]. Journal of Constructional Steel Research, 2004, 60(3-5): 401-410.
[14] 张玉成,杨光华,姜 燕,等.软土地区双排钢板桩围堰支护结构的应用及探讨[J].岩土工程学报,2012,34(增):659-665.
ZHANG Yu-cheng, YANG Guang-hua, JIANG Yan, et al.Application of retaining structure of steel sheet pile cofferdam in soft soil area[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(S): 659-665.(in Chinese)
[15] 潘 泓,王加利,曹 洪,等.钢板桩围堰在不同施工工序下的变形及内力特性研究[J].岩石力学与工程学报,2013,32(11):2316-2324.
PAN Hong, WANG Jia-li, CAO Hong, et al. Research on deformation and internal force characteristics of steel sheet pile cofferdam under different construction procedures[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(11): 2316-2324.(in Chinese)
[16] LEFAS I D, GEORGIANNOU V N. Analysis of a cofferdam support and design implications[J]. Computers and Structures, 2001, 79(26-28): 2461-2469.
[17] 杜 闯,丁红岩,张浦阳.钢板桩围堰有限元分析[J].岩土工程学报,2014,36(增2):159-164.
DU Chuang, DING Hong-yan, ZHANG Pu-yang, et al. Analysis of steel sheet pile cofferdam using finite element method[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(S2): 159-164.(in Chinese)
[18] 刘 芳,张国庆,蒋明镜,等.钢板桩挡墙主动土压力分布的形状效应[J].岩土力学,2012,33(增1):315-320.
LIU Fang, ZHANG Guo-qing, JIANG Ming-jing, et al.Impact of sectional shape of steel sheet pile wall on active earth pressure[J]. Rock and Soil Mechanics, 2012, 33(S1): 315-320.(in Chinese)
[19] 武崇福,李 玉,张志军.桩锚支护体系竖向土拱效应分析与桩后土压力计算[J].交通运输工程学报,2014,14(3):24-33.
WU Chong-fu, LI Yu, ZHANG Zhi-jun. Vertical soil arch effect analysis and soil pressure calculation behind piles for pile-anchor supporting system[J]. Journal of Traffic and Transportation Engineering, 2014, 14(3): 24-33.(in Chinese)
[20] MO Hai-hong, ZHOU Han-xiang. The optimal construction design of deep excavation[J]. Journal of South China University of Technology: Natural Science Edition, 2000, 28(12): 59-65.
[21] 王加利.钢板桩墙在不同施工工序下的变形及内力特性研究[D].广州:华南理工大学,2012.
WANG Jia-li. Study on the deformation and internal force characteristics of steel sheet pile walls in different construction orders[D]. Guangzhou: South China University of Technology, 2012.(in Chinese)
[22] AURICCHIO F, BALDUZZI G, LOVADIAN C. The dimensional reduction modelling approach for 3D beams: differential equations and finite-element solutions based on Hellinger-Reissner principle[J]. International Journal of Solids and Structures, 2013, 50(25/26): 4184-4196.
[23] 张 庆,王 磊.基于微分方程组的多排桩内力分析[J].吉林大学学报:工学版,2014,44(5):1327-1333.
ZHANG Qing, WANG Lei. Internal force analysis of multiple rows of piles based on differential equation set[J]. Journal of Jilin University: Engineering and Technology Edition, 2014, 44(5): 1327-1333.(in Chinese)
[24] 潘 泓,曹 洪,尹一鸣.广州猎德大桥钢板桩围堰的设计与监测[J].岩石力学与工程学报,2009,28(11):2242-2248.
PAN Hong, CAO Hong, YIN Yi-ming. Design and monitoring of steel sheet pile cofferdams of Liede Bridge in Guangzhou[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(11): 2242-2248.(in Chinese)
[25] BERESLAVSKII E N. The flow of ground waters around a Zhukovskii sheet pile[J]. Journal of Applied Mathematics and Mechanics, 2011, 75(2): 210-217.
[26] CRAWFORD R J, BYFIELD M P. A numerical model for predicting the bending strength of Larssen steel sheet piles[J]. Journal of Constructional Steel Research, 2002, 58(10): 1361-1374.
[27] TRAVERS R, YEOW H C. Canary wharf crossrail station cofferdam, London, UK: design, construction and performance[J]. Geotechnical Engineering, 2014, 167(2): 169-181.
[28] 李迎九.钢板桩围堰施工技术[J].桥梁建设,2011(2):76-79,84.
LI Ying-jiu. Construction techniques of steel sheet pile cofferdams[J]. Bridge Construction, 2011(2): 76-79, 84.(in Chinese)
[29] 黄 强.建筑基坑支护技术规程应用手册[M].北京:中国建材工业出版社,2016.
HUANG Qiang. Application Manual of Technical Specification for Retaining and Protection of Building Foundation Excavations[M]. Beijing: China Building Materials Press, 2016.(in Chinese)
[30] 胡大琳,王天利,陈 峰,等.半整体式桥台无伸缩缝桥静力分析[J].交通运输工程学报,2006,6(1):52-62.
HU Da-lin, WANG Tian-li, CHEN Feng, et al. Static analysis of semi integral abutment jointless bridge[J]. Journal of Traffic and Transportation Engineering, 2006, 6(1): 52-62.(in Chinese)

Memo

Memo:
-
Last Update: 2016-12-20