[1] 吴海军,刘 健,张 雷.平转连续梁桥主梁现浇施工中的摩阻效应[J].重庆交通大学学报:自然科学版,2013,32(2):183-186.WU Hai-jun, LIU Jian, ZHANG Lei. Friction effect of girder of horizontal swing continuous beam bridge in cast-in-site construction[J]. Journal of Chongqing Jiaotong University: Natural Science, 2013, 32(2): 183-186.(in Chinese)
[2] 车晓军,张谢东,朱海清.基于球铰应力差法的T构转体桥不平衡力矩预估[J].桥梁建设,2014,44(4):57-61.CHE Xiao-jun, ZHANG Xie-dong, ZHU Hai-qing. Estimation of unbalancing torque of rotationally erected T-frame bridge based on ball joint stress difference method[J]. Bridge Construction, 2014, 44(4): 57-61.(in Chinese)
[3] 杜嘉俊.桥梁转体法施工技术创新与展望[J].铁道建筑技术,2012(4):7-11.DU Jia-jun. Innovation and prospect on bridge construction technology of rotation method[J]. Railway Construction Technology, 2012(4): 7-11.(in Chinese)
[4] 张健峰,钟启宾.桥梁水平转体法施工的成就及发展[J].铁道标准设计,1992(6):19-28,41.ZHANG Jian-feng, ZHONG Qi-bin. The achievement and development of bridge construction under level rotation[J]. Railway Standard Design, 1992(6): 19-28, 41.(in Chinese)
[5] 陈宝春,孙 潮,陈友杰.桥梁转体施工方法在我国的应用与发展[J].公路交通科技,2001,18(2):24-28.CHEN Bao-chun, SUN Chao, CHEN You-jie. Application and development of swing method of bridge construction in China[J]. Journal of Highway and Transportation Research and Development, 2001, 18(2): 24-28.(in Chinese)
[6] SIWOWSKI T, WYSOCKI A. Horizontal rotation via floatation as an accelerated bridge construction for long-span footbridge erection: case study[J]. Journal of Bridge Engineering, 2015, 20(4): 1-9.
[7] SAIIDI M S, VOSOOGHI A, NELSON R B. Shake-table studies of a four-span reinforced concrete bridge[J]. Journal of Structural Engineering, 2013, 139(8): 1352-1361.
[8] FUCHS N, TOMLINSON K, BUCKBY R. El Ferdan Bridge, Egypt: the world’s longest swing bridge[J]. Proceedings of the Institution of Civil Engineers, 2003(156): 21-30.
[9] 童激扬,郑舟军.武汉市姑嫂树路高架桥转体平台墩仿真计算[J].桥梁建设,2013,43(2):64-69.TONG Ji-yang, ZHENG Zhou-jun. Simulation calculation of rotation platform piers of Gusaoshu Road Viaduct in Wuhan City[J]. Bridge Construction, 2013, 43(2): 64-69.(in Chinese)
[10] 车晓军,张谢东.大吨位T形刚构桥转体过程抗倾覆性能[J].中国公路学报,2014,27(8):66-72.CHE Xiao-jun, ZHANG Xie-dong. Anti-overturning in swivel process of large tonnage T-rigid frame bridge[J]. China Journal of Highway and Transport, 2014, 27(8): 66-72.(in Chinese)
[11] 郭子仪,陈小佳,郑舒月,等.转体施工转动体系不平衡力矩测试方法研究[J].公路工程,2014,39(3):73-76,82.GUO Zi-yi, CHEN Xiao-jia, ZHENG Shu-yue, et al. Research on swivel construction counterweight methods for swivel bridges[J]. Highway Engineering, 2014, 39(3): 73-76, 82.(in Chinese)
[12] 魏 峰,陈 强,马 林.北京市五环路斜拉桥转动体不平衡重称重试验分析[J].铁道建筑,2005(4):4-6.WEI Feng, CHEN Qiang, MA Lin. Twist unbalanced weigh test analysis of cable-stayed bridge in the Five Ring Road of Beijing City[J]. Railway Engineering, 2005(4): 4-6.(in Chinese)
[13] 祝和意.斜拉桥转动体不平衡重称重实验分析[J].四川建筑科学研究,2012,38(3):66-70.ZHU He-yi. Twist unbalanced weigh test analysis of cable-stayed bridge[J]. Sichuan Building Science, 2012, 38(3): 66-70.(in Chinese)
[14] 陈 玥.高速列车气动作用及其对跨线斜拉桥的影响研究[D].长沙:中南大学,2013.CHEN Yue. Study of aerodynamic effect of high-speed passing train and its effect on cable-stayed bridge crossing the line[D]. Changsha: Central South University, 2013.(in Chinese)
[15] 郭亚娟,李宏哲.邹城转体斜拉桥转盘结构受力分析[J].中外公路,2013,33(1):119-122.GUO Ya-juan, LI Hong-zhe. Force research for turntable of rotating cable-stayed bridge in Zoucheng[J]. Journal of China and Foreign Highway, 2013, 33(1): 119-122.(in Chinese)
[16] 戴公连,粟 淼,刘文硕,等.槽型断面梁斜拉桥塔梁墩固结区受力特性研究[J].湖南大学学报:自然科学版,2014,41(1):27-32.DAI Gong-lian, SU Miao, LIU Wen-shuo, et al. Stress analysis of pier-tower-girder fixed region of cable-stayed bridge with trough girder[J]. Journal of Hunan University: Natural Sciences, 2014, 41(1): 27-32.(in Chinese)
[17] 史 娣.武汉二环线上跨铁路立交桥总体设计[J].世界桥梁,2015,43(1):7-10,47.SHI Di. Overall design of a railway crossing flyover on Wuhan Second Ring Road[J]. World Bridges, 2015, 43(1): 7-10, 47.(in Chinese)
[18] ATES S. Numerical modelling of continuous concrete box girder bridges considering construction stages[J]. Applied Mathematical Modelling, 2011, 35(8): 3809-3820.
[19] WATANABE E, MARUYAMA T, TANAKA H, et al. Design and construction of a floating swing bridge in Osaka[J]. Marine Structures, 2000, 13(4/5): 437-458.
[20] 廖小雄,黄 艳,郭 奔,等.基于ANSYS的斜拉桥施工过程模拟分析[J].武汉理工大学学报:交通科学与工程版,2006,30(3):496-499.LIAO Xiao-xiong, HUANG Yan, GUO Ben, et al. Simulation and analysis of construction state of cable-stayed bridge based on ANSYS[J]. Journal of Wuhan University of Technology: Transportation Science and Engineering, 2006, 30(3): 496-499.(in Chinese)
[21] 高陈燕.应用ANSYS软件分析连续梁桥的动态响应[D].西安:长安大学,2008.GAO Chen-yan. Analysis of dynamic response of the continuous girder bridge with ANSYS[D]. Xi’an: Chang’an University, 2008.(in Chinese)
[22] 颜 毅,杜 鹏,高英祚,等.桥梁施工过程分析在ANSYS中的实现方法[J].重庆交通大学学报:自然科学版,2007,26(增):18-21.YAN Yi, DU Peng, GAO Ying-zuo, et al. Method of bridge construction process analysis in ANSYS[J]. Journal of Chongqing Jiaotong University: Natural Science, 2007, 26(S): 18-21.(in Chinese)
[23] BROWNJOHN J M W, LEE J, CHEONG B. Dynamic performance of a curved cable-stayed bridge[J]. Engineering Structures, 1999, 21(11): 1015-1027.
[24] LOZANO-GALANT J A, PAY’A-ZAFORTEZA I, XU D, et al. Analysis of the construction process of cable-stayed bridges built on temporary supports[J]. Engineering Structures, 2012(40): 95-106.
[25] 汪冬生,吴铁君.ANSYS中的钢筋混凝土单元[J].武汉理工大学学报:交通科学与工程版,2004,28(4):526-529.WANG Dong-sheng, WU Tie-jun. Reinforced concrete units in ANSYS software[J]. Journal of Wuhan University of Technology: Transportation Science and Engineering, 2004, 28(4): 526-529.(in Chinese)