[1] 沈志凌.高速铁路CTCS-3列控系统无线闭塞中心设备数量计算原则和方法的研究[J].铁道标准设计,2009(增1):136-137,150.SHEN Zhi-ling. Research on the principle and method of radio block center number of high-speed railway CTCS-3 train control system[J]. Railway Standard Design, 2009(S1): 136-137, 150.(in Chinese)
[2] 石先明.高速铁路CTCS-3级列控系统无线闭塞中心工程设计[J].中国铁路,2009(11):1-6.SHI Xian-ming. Engineering design of radio block center in CTCS-3 train control system for high-speed railway[J]. Chinese Railways, 2009(11): 1-6.(in Chinese)
[3] 赵宇坤.CTCS-3级列控系统RBC设置及容量计算方法研究[D]. 兰州:兰州交通大学,2011.ZHAO Yu-kun. Research of calculation method for RBC setting and capacity in CTCS-3[D]. Lanzhou: Lanzhou Jiaotong University, 2011.(in Chinese)
[4] 任 伟,熊 鹰,张树龙.基于网络分析法的舰舰导弹性能评估方法研究[J].舰船电子工程,2012,32(10):26-28.REN Wei, XIONG Ying, ZHANG Shu-long. An approach to performance evaluation of surface to surface missile based on analytic network process[J]. Ship Electronic Engineering, 2012, 32(10): 26-28.(in Chinese)
[5] 石福丽,方志刚,杨 峰,等.基于仿真的潜艇装备作战能力ANP幂指数评估方法[J].国防科技大学学报,2011,33(4):168-174.SHI Fu-li, FANG Zhi-gang, YANG Feng, et al. ANP power index evaluation method for operational capability of submarine equipment based on simulation[J]. Journal of National University of Defense Technology, 2011, 33(4): 168-174.(in Chinese)
[6] 王海涌,张玮玥,王晓明,等.基于ANP和VPRS的高速列车舒适性综合评价指标权重分析[J].铁道学报,2014,36(6):15-20.WANG Hai-yong, ZHANG Wei-yue, WANG Xiao-ming, et al. ANP and VPRS based analysis on index weight for comprehensive evaluation of comfort of high-speed train[J]. Journal of the China Railway Society, 2014, 36(6): 15-20.(in Chinese)
[7] 李金超,李金颖,牛东晓,等.基于ANP的电网企业运营能力评价模型研究[J].电力系统保护与控制,2011,39(19):37-43.LI Jin-chao, LI Jin-ying, NIU Dong-xiao, et al. Study on the evaluation model for the power grid corporation operation ability based on ANP[J]. Power System Protection and Control, 2011, 39(19): 37-43.(in Chinese)
[8] 赵高强,郭 森,李泓泽,等.基于ANP-GCDM模型的风电项目经济外部性评价[J].华北电力大学学报,2012,39(4):59-64,71.ZHAO Gao-qiang, GUO Sen, LI Hong-ze, et al. Evaluation on economic externality of wind power project based on ANP-GCDM[J]. Journal of North China Electric Power University, 2012, 39(4): 59-64, 71.(in Chinese)
[9] 王效俐,张 默.物流服务供应链突发事件合作补救能力评价模型[J].同济大学学报:自然科学版,2014,42(1):159-166.WANG Xiao-li, ZHANG Mo. Cooperation recovery capability evaluation model of logistics service supply chain in emergency[J]. Journal of Tongji University: Natural Science, 2014, 42(1): 159-166.(in Chinese)
[10] 陈志祥.基于ANP理论的供需协调绩效评价模型与算法[J].计算机集成制造系统,2004,10(3):286-291.CHEN Zhi-xiang. Model and algorithms of supply and demand coordination performance measurement based on ANP theory[J]. Computer Integrated Manufacturing Systems, 2004, 10(3): 286-291.(in Chinese)
[11] SAATY T L. Fundamentals of the analytic network process-dependence and feedback in decision-making with a single network[J]. Journal of Systems Science and Systems Engineering, 2004, 13(2): 129-157.
[12] 田小革,林 杜,吴孙德.基于模糊复合物元法的水泥路面性能评价[J].交通运输工程学报,2010,10(2):26-29,35.TIAN Xiao-ge, LIN Du, WU Sun-de. Performance evaluation of Portland cement concrete pavement based on fuzzy complex matter element method[J]. Journal of Traffic and Transportation Engineering, 2010, 10(2): 26-29, 35.(in Chinese)
[13] WANG Ying-ming, LIU Jun, ELHAG T M S. An intergrated AHP-DEA methodology for bridge risk assessment[J]. Computers and Industrial Engineering, 2008, 54(3): 513-525.
[14] 武荣桢,翟栋栋,郗恩崇,等.城市公共交通服务满意度评价模型[J].交通运输工程学报,2009,9(4):65-70.WU Rong-zhen, ZHAI Dong-dong, XI En-chong, et al. Evaluation model of satisfaction degree for urban public transit service[J]. Journal of Traffic and Transportation Engineering, 2009, 9(4): 65-70.(in Chinese)
[15] UYAN M. MSW landfill site selection by combining AHP with GIS for Konya, Turkey[J]. Environmental Earth Sciences, 2014, 71(4): 1629-1639.
[16] BARTON R R, NELSON B L, XIE Wei. Quantifying input uncertainty via simulation confidence intervals[J]. INFORMS Journal on Computing, 2014, 26(1): 74-87.
[17] 陈建球,唐 涛.基于改进FAHP方法的列车运行控制系统仿真可信度研究[J].铁道学报,2014,36(3):59-66.CHEN Jian-qiu, TANG Tao. Research on simulation credibility of train operation control system based on improved FAHP method[J]. Journal of the China Railway Society, 2014, 36(3): 59-66.(in Chinese)
[18] 苟晨曦,蔡伯根,唐 涛,等.无线闭塞中心测试案例生成方法[J].交通运输工程学报,2011,11(4):114-122.GOU Chen-xi, CAI Bai-gen, TANG Tao, et al. Test case generation method of radio block center[J]. Journal of Traffic and Transportation Engineering, 2011, 11(4): 114-122.(in Chinese)
[19] 吕继东,唐 涛,贾 昊.客运专线CTCS-3级列控系统无线闭塞中心的建模与验证[J].铁道学报,2010,32(6):34-42.LU Ji-dong, TANG Tao, JIA Hao. Modeling and verification of radio block center of CTCS-3 train control system for dedicated passengers lines[J]. Journal of the China Railway Society, 2010, 32(6): 34-42.(in Chinese)
[20] 牛 儒,曹 源,唐 涛.ETCS-2级列控系统RBC交接协议的形式化分析[J].铁道学报,2009,31(4):52-58.NIU Ru, CAO Yuan, TANG Tao. Formal modelling and analysis of RBC handover protocol for ETCS level 2 using stochastic Petri nets[J]. Journal of the China Railway Society, 2009, 31(4): 52-58.(in Chinese)
[21] 马小玲,张友鹏,杜求茂,等.计算机联锁系统的可靠性和安全性比较[J].铁路计算机应用,2009,18(6):46-49.MA Xiao-ling, ZHANG You-peng, DU Qiu-mao, et al. Comparing of reliability and security with computer-based interlocking system multiplying model[J]. Railway Computer Application, 2009, 18(6): 46-49.(in Chinese)
[22] 梁 楠,王海峰.基于SPN的CTCS-3级列控系统RBC实时性能分析[J].铁道学报,2011,33(2):67-71.LIANG Nan, WANG Hai-feng. Real-time performance analysis of RBC system for CTCS lever 3 using stochastic Petri networks[J]. Journal of the China Railway Society, 2011, 33(2): 67-71.(in Chinese)