[1] 刘 刚,王华胜,文 礼.高速列车修程修制技术[J].中国铁路,2010(12):62-66.
LIU Gang, WANG Hua-sheng, WEN Li.High-speed train repair process and system technologies[J]. Chinese Railways, 2010(12): 62-66.(in Chinese)
[2] 刘丽影,刘继刚,刘 继.我国高速动车组检修制度[J].同济大学学报:自然科学版,2001,29(8):121-124.
LIU Li-ying, LIU Ji-gang, LIU Ji. Study on maintenance system of electric multiple unit[J]. Journal of Tongji University: Natural Science, 2001, 29(8): 121-124.(in Chinese)
[3] 韩增力.关于动车组检修性能的探讨[J].铁道机车车辆,2011,31(3):90-92.
HAN Zeng-li. Analysis of EMU maintenance performance[J]. Railway Locomotive and Car, 2011, 31(3): 90-92.(in Chinese)
[4] 吴庄胜,赵 清,王伯铭.高速列车运用检修及动车段的设计研究[J].西南交通大学学报,2006,32(3):277-282.
WU Zhuang-sheng, ZHAO Qing, WANG Bo-ming. Operation and maintenance of high speed trains[J]. Journal of Southwest Jiaotong University, 2006, 32(3): 277-282.(in Chinese)
[5] 匡双芹.动车组检修基地与动车检修分析[J].产业与科技论坛,2011,10(2):90-91.
KUANG Shuang-qin. Maintenance bases and maintenance analysis of EMU[J]. Industrial and Science Tribune, 2011, 10(2): 90-91.(in Chinese)
[6] 张建成.用机车当量公里概念确定机车检修周期[J].铁道机车车辆工人,2005(6):10-12.
ZHANG Jian-cheng. Deciding the maintenance cycle of locomotive by equivalent kilometers [J]. Railway Locomotive and Rolling Stock Workers, 2005(6): 10-12.(in Chinese)
[7] 赵中喜.电力机车当量公里数学模型研究[J].铁道机车车辆,2005,25(增):46-47.
ZHAO Zhong-xi. Study of mathematical model on electric locomotive equivalent kilometers[J]. Railway Locomotive and Car, 2005, 25(S): 46-47.(in Chinese)
[8] 王锐锋,罗 扬,阎 军,等.基于人工神经网络的机车当量模型的研究[J].内燃机车,2008(3):11-14.
WANG Rui-feng, LUO Yang, YAN Jun, et al. Study of locomotive equivalent model based on artificial neural network[J]. Diesel Locomotives, 2008(3): 11-14.(in Chinese)
[9] 齐金平,宋 薇,李宏亮,等.基于遗传算法的二元决策树方法在机车当量公里数学模型中的应用研究[J].内燃机车,2010(2):13-15,19.
QI Jin-ping, SONG Wei, LI Hong-liang, et al. Application of genetic algorithm-based binary decision tree method to mathematical model for equivalent locomotive running kilometers[J]. Diesel Locomotives, 2010(2): 13-15, 19.(in Chinese)
[10] HUANG Hong-zhong, TONG Xin, ZUO Ming-jian. Posbist fault tree analysis of coherent systems[J]. Reliability Engin-eering and System Safety, 2004, 84(2): 141-148.
[11] 齐金平,史亚娟,杨团名.基于模糊故障树的铁路机车检修周期预测研究[J].兰州交通大学学报,2010,29(3):62-66.
QI Jin-ping, SHI Ya-juan, YANG Tuan-ming. Study of forecast for railway locomotive overhaul cycle on fuzzy fault tree[J]. Journal of Lanzhou Jiaotong University, 2010,29(3): 62-66.(in Chinese)
[12] BAE C, KOO T, SON Y, et al. A study on reliability centered maintenance planning of a standard electric motor unit subsystem using computational techniques[J]. Journal of Mechanical Science and Technology, 2009, 23(4): 1157-1168.
[13] 张才春,陈建华,花 伟.基于不同检修能力的动车组运用计划研究[J].中国铁道科学,2010,31(5):130-133.
ZHANG Cai-chun, CHEN Jian-hua, HUA Wei. Research on the EMU operation plan based on different maintenance capacity[J]. China Railway Science, 2010, 31(5): 130-133.(in Chinese)
[14] 史 峰,周文梁,郁宇卫,等.客运专线动车组运用计划优化模型与算法[J].铁道学报,2011,33(1):8-13.
SHI Feng, ZHOU Wen-liang, YU Yu-wei, et al. Optimized model and algorithm of motor train-sets scheduling for dedicated passenger lines[J]. Journal of the China Railway Society, 2011, 33(1): 8-13.(in Chinese)
[15] 王 莹,刘 军,苗建瑞.基于列生成算法的动车组检修计划优化[J].中国铁道科学,2010,31(2):115-120.
WANG Ying, LIU Jun, MIAO Jian-rui. Column generation algorithms based optimization method for maintenance scheduling of multiple unit[J]. China Railway Science, 2010, 31(2): 115-120.(in Chinese)
[16] 王忠凯,史天运,张惟皎,等.动车组运用和检修计划一体化编制模型及算法[J].中国铁道科学,2012,33(3):102-108.
WANG Zhong-kai, SHI Tian-yun, ZHANG Wei-jiao, et al. Model and algorithm for the integrative scheduling of EMU utilization plan and maintenance plan[J].China Railway Science, 2012, 33(3): 102-108.(in Chinese)
[17] 陈 彦.动车组高级修检修计划编制模型与算法[J].铁路计算机应用,2013,22(1):22-24.
CHEN Yan. Model and algorithm for making overhaul plan of EMUs[J]. Railway Computer Application, 2013, 22(1): 22-24.(in Chinese)