|Table of Contents|

Characteristic of crack spacing for continuously reinforced concrete pavement(PDF)

《交通运输工程学报》[ISSN:1671-1637/CN:61-1369/U]

Issue:
2013年04期
Page:
1-7
Research Field:
道路与铁道工程
Publishing date:

Info

Title:
Characteristic of crack spacing for continuously reinforced concrete pavement
Author(s):
ZHANG Xiao1 2 HU Sheng-neng3 ZHAO Hong-duo1 ZHAO Dui-jia2
1. Key Laboratory of Road and Traffic Engineering of Ministry of Education, Tongji University, Shanghai 201804, China; 2. Key Laboratory of Highway Construction and Maintenance Technology in Loess Region, Shanxi Transportation Research Institute, Taiyuan 030006, Shanxi, China; 3.School of Civil Engineering and Communications, North China University of Water Resources and Electric Power, Zhengzhou 450011, Henan, China
Keywords:
pavement engineering continuously reinforced concrete pavement crack spacing reinforcement ratio mechanistic-empirical pavement design guide
PACS:
U416.216.2
DOI:
-
Abstract:
The characteristics of average crack spacing models for continuously reinforced concrete pavement(CRCP)in AASHTO—1993 and Mechanistic-Empirical Pavement Design Guide(MEPDG)were analyzed. A total of 1 171 crack spacing data were collected from 29 CRCP experimental sections. Classifying, statistical analysis, distribution fitting and variance analysis were conducted by using the data. The parameters of AASHTO—1993 and MEPDG models were determined respectively, and two models were validated by using the data. Research result shows that cracks can be classified into six types according to the patterns, and CRCP crack spacing distribution is subject to four-parameter Dagum distribution. The differences of CRCP average crack spacings for different slab thicknesses at the same reinforcement ratio are not significant. AASHTO—1993 model overestimates average crack spacing with an error of 0.13 m, MEPDG model tremendously underestimates average crack spacing with an error of 1.7 m. 8 tabs, 4 figs, 15 refs.

References:

[1] ARA Inc. Guide for mechanistic-empirical design of new and rehabilitated pavement structures[R]. Washington DC: TRB, 2004.
[2] ZOLLINGER D G. Investigation of punchout distress in continuously reinforced concrete pavement[D]. Urbana: University of Illinois at Urbana-Champaign, 1989.
[3] ZOLLINGER D G, BUCH N, XIN D, et al. Performance of continuously reinforced concrete pavements, volume Ⅵ: CRC pavement design, construction, and performance[R]. Washington DC: FHWA, 1999.
[4] WON M C, KIM S M, MERRITT D, et al. Horizontal cracking and pavement distress in Portland cement concrete pavement[C]∥SPROULE W J, JANSEN S. Designing, Constructing, Maintaining and Financing Today's Airport Projects. Orlando: American Society of Civil Engineers, 2002: 1-10.
[5] CHEN D H, LIN H H, SUN R. Field performance evaluations of partial-depth repairs[J]. Construction and Building Materials, 2011, 25(3): 1369-1378.
[6] KIM S M, WON M C. Horizontal cracking in continuously reinforced concrete pavements[J]. ACI Structural Journal, 2004, 101(6): 784-791.
[7] WON M C, HANKINS K, MCCULLOUGH B F. Mechanistic analysis of continuously reinforced concrete pavements considering material characteristics, variability, and fatigue[R]. Austin: University of Texas, 1991.
[8] HUANG Y H. Pavement Analysis and Design[M]. 2nd Edition. Englewood Cliffs: Prentice Hall, 2004.
[9] 陈锋锋,黄晓明,秦永春.连续配筋混凝土路面横向裂缝分布模型的研究[J].公路交通科技,2006,23(6):18-21. CHEN Feng-feng, HUANG Xiao-ming, QIN Yong-chun. Study on the probability distribution model of continuously reinforced concrete pavement transverse cracks[J]. Journal of Highway and Transportation Research and Development, 2006, 23(6): 18-21.(in Chinese)
[10] 查旭东.连续配筋混凝土路面横向开裂发展规律[J].交通运输工程学报,2008,8(2):65-68. ZHA Xu-dong. Development laws of transverse cracking for continuously reinforced concrete pavement[J]. Journal of Traffic and Transportation Engineering, 2008, 8(2): 65-68.(in Chinese)
[11] 张艳聪,田 波,申俊敏,等.隧道内连续配筋混凝土路面早期裂缝发展研究[J].公路,2012(3):99-103. ZHANG Yan-cong, TIAN Bo, SHEN Jun-min, et al. Development of early-age cracks of continuously reinforced concrete pavements in road tunnels[J]. Highway, 2012(3): 99-103.(in Chinese)
[12] 张 翛,申俊敏,刘 海.AASHTO—1993连续配筋混凝土路面配筋设计验证研究[J].中外公路,2012,32(4):72-75. ZHANG Xiao, SHEN Jun-min, LIU Hai. Validation of AASHTO—1993 reinforcement design method for continuously reinforced concrete pavements[J]. Journal of China and Foreign Highway, 2012, 32(4): 72-75.(in Chinese)
[13] KOHLER E, ROESLER J. Crack spacing and crack width investigation from experimental CRCP sections[J]. International Journal of Pavement Engineering, 2006, 7(4): 331-340.
[14] SELEZNEVA O, DARTER M, ZOLLINGER D, et al. Characterization of transverse cracking spatial variability: use of long-term pavement performance data for continuously reinforced concrete pavement design[J]. Transportation Research Record, 2003(1849): 147-155.
[15] TAYABJI S D, WU C L, PLEI M. Performance of continuously reinforced concrete pavements in the LTPP program[C]∥International Society for Concrete Pavements. Proceedings of the 7th International Conference on Concrete Pavements: the Use of Concrete in Developing Long-Lasting Pavement Solutions for the 21st Century. Orlando: International Society for Concrete Pavements, 2001: 685-700.

Memo

Memo:
-
Last Update: 2013-08-30