[1] RAPP M H, GEHNER C D. Transfer optimization in an interactive graphic system for transit planning[J]. Transportation Research Record, 1976(619): 27-33.
[2] KYTE M, STANLEY K, GLEASON E. Planning, implementing, and evaluating a timed-transfer system in Portland, Oregon[J]. Transportation Research Record, 1982(877): 23-29.
[3] ABKOWITZ M, JOSEF R, TOZZI J, et al. Operational feasibility of timed transfer in transit systems[J]. Journal of Transportation Engineering, 1987, 113(2): 168-177.
[4] KLEMT W D, STEMME W. Schedule synchronization for public transit networks[J]. Lecture Notes in Economics and Mathematical Systems, 1988(308): 327-335.
[5] VOSS S. Network design formulations in schedule synchronization[J]. Lecture Notes in Economics and Mathematical Systems, 1992(386): 137-152.
[6] LEE K, SCHONFELD P. Optimal slack time for timed transfers at a transit terminal[J]. Journal of Advanced Transportation, 1991, 25(3): 281-308.
[7] DESILETS A, ROUSSEAU J M. SYNCHRO: a computer-assisted tool for the synchronization of transfers in public transit networks[J]. Lecture Notes in Economics and Mathematical Systems, 1992(386): 153-166.
[8] NELSON M, BRAND D, MANDEL M. Use and conse-quences of timed-transfers on US transit properties[J]. Transportation Research Record, 1981(798): 50-55.
[9] ADAMSKI A. Transfer optimization in public transport[J]. Lecture Notes in Economics and Mathematical Systems, 1995(430): 23-38.
[10] ADAMSKI A, CHMIEL W. Optimal service synchronization in public transport[C]∥IEEE. Proceedings of the 45th Annual Conference of the ORSNE. Wellington: IEEE, 2010: 140-149.
[11] MAXWELL R R. Intercity rail fixed-interval, timed-transfer, multihub system: applicability of the “integraler taktfahrplan” strategy to North America[J]. Transportation Research Record, 1999(1691): 1-11.
[12] BECKER A J, SPIELBERG F. Implementation of a timed transfer network at Norfolk, Virginia[J]. Transportation Research Record, 1999(1666): 3-13.
[13] CEDER A. Bus timetables with even passenger loads as opposed to even headways[J]. Transportation Research Record, 2001(1760): 3-9.
[14] CEDER A, GOLANY B, TAL O. Creating bus timetables with maximal synchronization[J]. Transportation Research Part A: Policy and Practice, 2001, 35(10): 913-928.
[15] CEDER A, STERN H I. Deficit function bus scheduling with deadheading trip insertions for fleet size reduction[J]. Transportation Science, 1981, 15(4): 338-363.
[16] CEDER A, TAL O. Designing synchronization into bus timetables[J]. Transportation Research Record, 2001(1760): 28-33.
[17] 石 琴,覃运梅,黄志鹏.公交区域调度的最大同步换乘模型[J].中国公路学报,2007,20(6):90-94.
SHI Qin, QIN Yun-mei, HUANG Zhi-peng. Maximal synchronous transfer model of bus regional dispatching[J]. China Journal of Highway and Transport, 2007, 20(6): 90-94.(in Chinese)