[1] ABDELGHANY K F, ABDELGHANY A F, EKOLLU G. An integrated decision support tool for airlines schedule recovery during irregular operations[J]. European Journal of Operational Research, 2008, 185(2): 825-848.
[2] 白 凤.不正常航班的飞机和机组调度研究[D].南京:南京航空航天大学,2010.
BAI Feng. Research on aircraft and crew rescheduling problems of irregular flight[D]. Nanjing: Nanjing University of Aeronautics and Astronautics, 2010.(in Chinese)
[3] TEODOROVIC D, GUBERINIC S. Optimal dispatching strategy on an airline network after a schedule perturbation[J]. European Journal of Operational Research, 1984, 15(2): 178-182.
[4] TEODOROVIC D, STOJKOVIC G. Model for operational daily airline scheduling[J]. Transportation Planning and Technology, 1990, 14(4): 273-285.
[5] JARRAH A I Z, YU Gang, KRISHNAMURTHY N, et al. A decision support framework for airline flight cancellations and delays[J]. Transportation Science, 1993, 27(3): 266-280.
[6] YAN Shang-yao, YANG D H. A decision support framework for handling schedule perturbation[J]. Transportation Research Part B: Methodological, 1996, 30(6): 405-419.
[7] ARGUELLO M F, BARD J F, YU Gang. A GRASP for aircraft routing in response to groundings and delays[J]. Journal of Combinatorial Optimization, 1997, 1(3): 211-228.
[8] 唐小卫,高 强,朱金福.不正常航班恢复模型的贪婪模拟退火算法研究[J].预测,2010,29(1):66-70.
TANG Xiao-wei, GAO Qiang, ZHU Jin-fu. Research on greedy simulated annealing algorithm of irregular flight schedule recovery model[J]. Forecasting, 2010, 29(1): 66-70.(in Chinese)
[9] WEI Guo, YU Gang, SONG M. Optimization model and algorithm for crew management during airline irregular operations[J]. Journal of Combinatorial Optimization, 1997, 1(3): 305-321.
[10] STOJKOVIC M, SOUMIS F, DESROSIERS J. The operational airline crew scheduling problem[J]. Transportation Science, 1998, 32(3): 232-245.
[11] LETTOVSKY L, JOHNSON E L, NEMHAUSER G L. Airline crew recovery[J]. Transportation Science, 2000, 34(4): 337-348.
[12] TEODOROVIC D, STOJKOVIC G. Model to reduce airline schedule disturbances[J]. Journal of Transportation Engin-eering, 1995, 121(4): 324-331.
[13] 刘德刚.航空公司实时飞机和机组调配问题的研究[D].北京:中国科学院,2002.
LIU De-gang. Aircraft rerouting and crew pairing repair during airline irregular operations[D]. Beijing: Chinese Academy of Sciences, 2002.(in Chinese)
[14] 朱 博,朱金福.飞机计划恢复的混合集合规划方法研究[J].小型微型计算机系统,2012,33(11):2556-2560.
ZHU Bo, ZHU Jin-fu. Research on mixed set programming for aircraft schedule recovery[J]. Journal of Chinese Computer Systems, 2012, 33(11): 2556-2560.(in Chinese)
[15] VAN HENTENRYCK P, SIMONIS H, DINCBAS M. Constraint satisfaction using constraint logic programming[J]. Artificial Intelligence, 1992, 58(1/2/3): 113-159.
[16] HOOKER J N. Logic, optimization and constraint programming[J]. INFORMS Journal on Computing Fall, 2002, 14(4): 295-321.
[17] 霍佳震,王新华.基于约束规划求解车辆调度问题[J].物流技术,2005,24(1):110-112.
HUO Jia-zhen, WANG Xin-hua. Solving vehicle scheduling problem based on constraint programming[J]. Logistics Technology, 2005, 24(1): 110-112.(in Chinese)
[18] ZHOU Jian-yang. A note on mixed set programming[C]∥IEEE. The 7th International Symposium on Operations Research and Its Applications. Zhangjiajie: IEEE, 2008: 131-140.
[19] ZHOU Jian-yang. Introduction to the constraint language NCL[J]. The Journal of Logic Programming, 2000, 45(1/2/3): 71-103.