[1] 李 嘉,方 霞.高速公路出入口设计与安全性研究[J].中南公路工程,2003,28(2):31-34.
LI Jia, FANG Xia. Study on design and safety of freeway exit and entrance[J]. Central South Highway Engineering, 2003, 28(2): 31-34.(in Chinese)
[2] 林小涵,关宏志.公路收费站ETC系统改造项目经济费用效益计算方法的研究[J].公路,2012,6(6):156-163.
LIN Xiao-han, GUAN Hong-zhi. A study on economic cost-benefit analysis method for ETC improvement project of highway toll station[J]. Highway, 2012, 6(6): 156-163.(in Chinese)
[3] GB 5768.3—2009,道路交通标志和标线[S].
GB 5768.3—2009, road traffic signs and markings[S].(in Chinese)
[4] 王 薇,杨兆升,赵丁选.有限阶段马尔可夫决策的可变限速控制模型[J].交通运输工程学报,2011,11(5):109-114.
WANG Wei, YANG Zhao-sheng, ZHAO Ding-xuan. Control model of variable speed limit based on finite horizon Markov decision-making[J]. Journal of Traffic and Transportation Engineering, 2011, 11(5): 109-114.(in Chinese)
[5] SHI Hua-jing, ZILIASKOPOULOS A. Traffic flow control using variable speed limits[C]∥ASCE. Proceedings of the Conference on Traffic and Transportation Studies. Guilin: ASCE, 2002: 658-665.
[6] 牛树云,刘 浩,冯建刚,等.基于模糊约束的可变信息板点位布设优化[J].系统工程,2010,28(3):98-102.
NIU Shu-yun, LIU Hao, FENG Jian-gang, et.al. The optimization of the planning and positioning of VMS based on fuzzy constrained conditions[J]. Systems Engineering, 2010, 28(3): 98-102.(in Chinese)
[7] 尚华艳,黄海军,高自友.基于元胞传输模型的可变信息标志选址问题研究[J].物理学报,2007,56(8):4342-4347.
SHANG Hua-yan, HUANG Hai-jun, GAO Zi-you. Locating the variable message signs by cell transmission model[J]. Acta Physica Shinic, 2007, 56(8): 4342-4347.(in Chinese)
[8] CHIU Y C, HUYNH N. Location configuration design for dynamic message signs under stochastic incident and ATIS scenarios[J]. Transportation Research Part C: Emerging Technologies, 2007, 17(1): 33-50.
[9] ABDEL-ATY M, CUNNINGHAM R J, GAYAH V V, et al. Dynamic variable speed limit strategies for real-time crash risk reduction on freeways[J]. Transportation Research Record Journal of the Transportation Reseach Board, 2008(2078): 108-116.
[10] 钟连德,孙小端,陈永胜,等.高速公路V/C与事故率关系研究[J].北京工业大学学报, 2007,33(1):37-40.
ZHONG Lian-de, SUN Xiao-duan, CHEN Yong-sheng, et al. Research on the relationship between V/C and crash rate on freeway[J]. Journal of Beijing University of Technology, 2007, 33(1): 37-40.(in Chinese)
[11] 侯典建,孙小端,贺玉龙.高速公路车速离散性与事故率的关系研究[J].交通标准化,2010(224):70-72.
HOU Dian-jian, SUN Xiao-duan, HE Yu-long. Relationship between speed difference and crash rate on freeway[J]. Transport Standardization, 2010(224): 70-72.(in Chinese)
[12] 钟连德,孙小端,陈永胜,等.高速公路大、小车速度差与事故率的关系[J].北京工业大学学报,2007,33(2):185-188.
ZHONG Lian-de, SUN Xiao-duan, CHEN Yong-sheng, et al. The Relationships between crash rates and average speed difference between cars and large vehicles on freeway[J]. Journal of Beijing University of Technology, 2007, 33(2): 185-188.(in Chinese)
[13] 田根平.高等级公路收费站通行能力评价研究[D].昆明:昆明理工大学,2008.
TIAN Gen-ping. Evaluation studies on traffic capacity of high-level highway toll station[D]. Kunming: Kunming University of Science and Technology, 2008.(in Chinese)
[14] 孔惠惠,秦 超,李新波,等.交通事故引起的排队长度及消散时间的估算[J].铁道运输与经济,2005,27(5):65-67.
KONG Hui-hui, QIN Chao, LI Xin-bo, et al. Estimation of queue length and dispersing time caused by traffic accident[J]. Railway Transport and Economy, 2005, 27(5): 65-67.(in Chinese)