|Table of Contents|

Simulation and monitoring of high-speed railway tied-arch bridge construction with arch first and beam late method(PDF)

《交通运输工程学报》[ISSN:1671-1637/CN:61-1369/U]

Issue:
2012年05期
Page:
28-36
Research Field:
道路与铁道工程
Publishing date:

Info

Title:
Simulation and monitoring of high-speed railway tied-arch bridge construction with arch first and beam late method
Author(s):
REN Wen-feng12 WANG Xing-hua1 TU Peng1
1. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China; 2. CCCC Road and Bridge International Co., Ltd., Beijing 100027, China
Keywords:
bridge engineering high-speed railway tied-arch bridge arch first and beam late construction simulation and monitoring
PACS:
U445.4
DOI:
-
Abstract:
The tied-arch bridge of Qingyang Harbour for Beijing-Shanghai High-Speed Railway was taken as research object, finite element simulation analysis and field monitoring were used, the stresses and strains of arch ribs and suspenders for high-speed railway tied-arch bridge with arch first and beam late construction method were calculated under different construction processes, and the change laws and control essentials of arch rib and suspender cable in construction process were analyzed. Calculation result shows that the maximal resilience deformation of arch rib is 37 mm by using finite element simulation, and the maximal compressive stress appears in the time between the closure of tied beams and the removing of temporary consolidation. The calculated elevations of arch rib points are identical with actual measurement values, and all the differences are less than 10 mm. The compressive stresses in main arch show a uniform distribution and are less than 80 MPa. So the construction method of arch rib integral hoisting and arch first and beam late is feasible. 3 tabs, 7 figs, 18 refs.

References:

[1] 彭桂瀚,董桔灿,陈宝春.钢管混凝土系杆拱斜吊杆试设计研究[J].福州大学学报:自然科学版,2009,37(4):560-566. PENG Gui-han, DONG Ju-can, CHEN Bao-chun. Trial-design research on inclined hangers in CFST bow string arch bridge[J]. Journal of Fuzhou University: Natural Science Edition, 2009, 37(4): 560-566.(in Chinese)
[2] 贺拴海,李春风,吕 婷,等.钢筋混凝土系杆拱桥稳定性影响参数[J].长安大学学报:自然科学版,2008,28(4):43-46. HE Shuan-hai, LI Chun-feng, LU Ting, et al. Influencing parameters of stability for reinforced concrete tied-arch bridge[J]. Journal of Chang'an University: Natural Science Edition, 2008, 28(4): 43-46.(in Chinese)
[3] 刘 钊.基于能量法的系杆拱桥最优吊杆内力的确定[J].工程力学,2009,26(8):168-173. LIU Zhao. Determination of the optimal hanger forces for tied-arch bridges based on energy methods[J]. Engineering Mechanics, 2009, 26(8): 168-173.(in Chinese)
[4] GHOLIPOUR A, ARAABI B N, LUCAS C. Predicting chaotic time series using neural and neurofuzzy models: a comparative study[J]. Neural Processing Letters, 2006, 24(3): 217-239.
[5] 陶慕轩,聂建国.预应力钢-混凝土连续组合梁的非线性有限元分析[J].土木工程学报,2011,44(2):8-20. TAO Mu-xuan, NIE Jian-guo. Nonlinear finite element analysis of prestressed continuous steel-concrete composite beams [J]. China Civil Engineering Journal, 2011, 44(2): 8-20.(in Chinese)
[6] 张 华.兰新铁路大跨度系杆拱桥施工[J].筑路机械与施工机械化,2012,29(3):67-69. ZHANG Hua. Construction of long-span tied arch bridge of Lanxin Railway[J]. Road Machinery and Construction Mechanization, 2012, 29(3): 67-69.(in Chinese)
[7] 窦 超,郭彦林.单轴对称截面圆弧拱弹性弯扭屈曲临界荷载[J].建筑科学与工程学报,2011,28(4):69-74. DOU Chao, GUO Yan-lin. Elastic flexural-torsional buckling load of monosymmetric circular arches[J]. Journal of Architecture and Civil Engineering, 2011, 28(4): 69-74.(in Chinese)
[8] 郝建强,米晧洁.乌鲁木齐河特大桥简支系杆拱施工监控方案[J].筑路机械与施工机械化,2012,29(4):72-75. HAO Jian-qiang, MI Hao-jie. Construction monitoring of simply supported tied arch of Urumqi Large Bridge[J]. Road Machinery and Construction Mechanization, 2012, 29(4): 72-75.(in Chinese)
[9] 张望喜,易伟建,王力力,等.连续梁桥拓展多跨双曲拱桥的分析与控制[J].建筑科学与工程学报,2010,27(1):25-30. ZHANG Wang-xi, YI Wei-jian, WANG Li-li, et al. Analysis and control of multi-span double arch bridge expanded by continuous bridge[J]. Journal of Architecture and Civil Engineering, 2010, 27(1): 25-30.(in Chinese)
[10] 刘 钊,吕志涛.竖吊杆与斜吊杆系杆拱结构的桥式研究[J].土木工程学报,2000,33(5):63-67. LIU Zhao, LU Zhi-tao. Comparative study on the tied-arch bridges with vertical and inclined hangers[J]. China Civil Engineering Journal, 2000, 33(5): 63-67.(in Chinese)
[11] 吴建武.刚构-单肋系杆拱组合桥梁空间非线性稳定分析[J].武汉理工大学学报,2008,30(8):139-142,177. WU Jian-wu. Three dimension nonlinear stability analysis of the combinational bridges with rigid frame and single-ribbed tied arch[J]. Journal of Wuhan University of Technology, 2008, 30(8): 139-142, 177.(in Chinese)
[12] 陈 淮,吴红升,唐 军.蒲山系杆拱桥吊杆张拉力的空间计算分析[J].铁道科学与工程学报,2008,5(2):12-16. CHEN Huai, WU Hong-sheng, TANG Jun. Spatial analysis of suspender tensile force for the Pushan CFST through arch bridge[J]. Journal of Railway Science and Engineering, 2008, 5(2): 12-16.(in Chinese)
[13] 周 德,叶梅新,罗如登.高速铁路下承式钢箱系杆拱结合桥的受力分析[J].中南大学学报:自然科学版,2009,40(5):1457-1464. ZHOU De, YE Mei-xin, LUO Ru-deng. Mechanical analysis of through tied-arch composite bridge on high-speed railway[J]. Journal of Central South University: Science and Technology, 2009, 40(5): 1457-1464.(in Chinese)
[14] 郝 超.大跨度钢斜拉桥的施工监控及其目标精度值[J].中国公路学报,2003,16(1):54-57. HAO Chao. Construction control and control precision goal of long-span steel cable-stayed bridge[J]. China Journal of Highway and Transport, 2003, 16(1): 54-57.(in Chinese)
[15] 余钱华.大跨混凝土桥梁施工监控中的应力分析与测试[J].中国公路学报,2008,21(2):68-73. YU Qian-hua. Stress analysis and measurement of long-span concrete bridge in process of construction supervisory control[J]. China Journal of Highway and Transport, 2008, 21(2): 68-73.(in Chinese)
[16] 李小和,孙新锋,王民焕.铁路(60+128+60)m系杆拱连续梁施工技术[J].桥梁建设,2009(5):53-56. LI Xiao-he, SUN Xin-feng, WANG Min-huan. Construction techniques for a(60+128+60)m tied arch and continuous girder bridge[J]. Bridge Construction, 2009(5): 53-56.(in Chinese)
[17] 丁 岩.高速铁路尼尔森体系系杆拱桥设计参数分析及调索研究[D].长沙:长沙理工大学,2010. DIN Yan. Analysis of structural parameters cable tension optimization of tied-arch bridge of Nielsen system in high-speed railway[D]. Changsha: Changsha University of Science and Technology, 2010.(in Chinese)
[18] 田仲初,丁 岩,蒋田勇.高速铁路尼尔森体系系杆拱桥徐变变形影响因素[J].长沙理工大学学报:自然科学版,2010,7(2):25-32. TIAN Zhong-chu, DIN Yan, JIANG Tian-yong. Influencing factors on creep deformation of tied-arch bridge of Nielsen system in high-speed railway[J]. Journal of Changsha University of Science and Technology: Natural Science, 2010, 7(2): 25-32.(in Chinese)

Memo

Memo:
-
Last Update: 2012-11-05