[1] 彭桂瀚,董桔灿,陈宝春.钢管混凝土系杆拱斜吊杆试设计研究[J].福州大学学报:自然科学版,2009,37(4):560-566.
PENG Gui-han, DONG Ju-can, CHEN Bao-chun. Trial-design research on inclined hangers in CFST bow string arch bridge[J]. Journal of Fuzhou University: Natural Science Edition, 2009, 37(4): 560-566.(in Chinese)
[2] 贺拴海,李春风,吕 婷,等.钢筋混凝土系杆拱桥稳定性影响参数[J].长安大学学报:自然科学版,2008,28(4):43-46.
HE Shuan-hai, LI Chun-feng, LU Ting, et al. Influencing parameters of stability for reinforced concrete tied-arch bridge[J]. Journal of Chang'an University: Natural Science Edition, 2008, 28(4): 43-46.(in Chinese)
[3] 刘 钊.基于能量法的系杆拱桥最优吊杆内力的确定[J].工程力学,2009,26(8):168-173.
LIU Zhao. Determination of the optimal hanger forces for tied-arch bridges based on energy methods[J]. Engineering Mechanics, 2009, 26(8): 168-173.(in Chinese)
[4] GHOLIPOUR A, ARAABI B N, LUCAS C. Predicting chaotic time series using neural and neurofuzzy models: a comparative study[J]. Neural Processing Letters, 2006, 24(3): 217-239.
[5] 陶慕轩,聂建国.预应力钢-混凝土连续组合梁的非线性有限元分析[J].土木工程学报,2011,44(2):8-20.
TAO Mu-xuan, NIE Jian-guo. Nonlinear finite element analysis of prestressed continuous steel-concrete composite beams [J]. China Civil Engineering Journal, 2011, 44(2): 8-20.(in Chinese)
[6] 张 华.兰新铁路大跨度系杆拱桥施工[J].筑路机械与施工机械化,2012,29(3):67-69.
ZHANG Hua. Construction of long-span tied arch bridge of Lanxin Railway[J]. Road Machinery and Construction Mechanization, 2012, 29(3): 67-69.(in Chinese)
[7] 窦 超,郭彦林.单轴对称截面圆弧拱弹性弯扭屈曲临界荷载[J].建筑科学与工程学报,2011,28(4):69-74.
DOU Chao, GUO Yan-lin. Elastic flexural-torsional buckling load of monosymmetric circular arches[J]. Journal of Architecture and Civil Engineering, 2011, 28(4): 69-74.(in Chinese)
[8] 郝建强,米晧洁.乌鲁木齐河特大桥简支系杆拱施工监控方案[J].筑路机械与施工机械化,2012,29(4):72-75.
HAO Jian-qiang, MI Hao-jie. Construction monitoring of simply supported tied arch of Urumqi Large Bridge[J]. Road Machinery and Construction Mechanization, 2012, 29(4): 72-75.(in Chinese)
[9] 张望喜,易伟建,王力力,等.连续梁桥拓展多跨双曲拱桥的分析与控制[J].建筑科学与工程学报,2010,27(1):25-30.
ZHANG Wang-xi, YI Wei-jian, WANG Li-li, et al. Analysis and control of multi-span double arch bridge expanded by continuous bridge[J]. Journal of Architecture and Civil Engineering, 2010, 27(1): 25-30.(in Chinese)
[10] 刘 钊,吕志涛.竖吊杆与斜吊杆系杆拱结构的桥式研究[J].土木工程学报,2000,33(5):63-67.
LIU Zhao, LU Zhi-tao. Comparative study on the tied-arch bridges with vertical and inclined hangers[J]. China Civil Engineering Journal, 2000, 33(5): 63-67.(in Chinese)
[11] 吴建武.刚构-单肋系杆拱组合桥梁空间非线性稳定分析[J].武汉理工大学学报,2008,30(8):139-142,177.
WU Jian-wu. Three dimension nonlinear stability analysis of the combinational bridges with rigid frame and single-ribbed tied arch[J]. Journal of Wuhan University of Technology, 2008, 30(8): 139-142, 177.(in Chinese)
[12] 陈 淮,吴红升,唐 军.蒲山系杆拱桥吊杆张拉力的空间计算分析[J].铁道科学与工程学报,2008,5(2):12-16.
CHEN Huai, WU Hong-sheng, TANG Jun. Spatial analysis of suspender tensile force for the Pushan CFST through arch bridge[J]. Journal of Railway Science and Engineering, 2008, 5(2): 12-16.(in Chinese)
[13] 周 德,叶梅新,罗如登.高速铁路下承式钢箱系杆拱结合桥的受力分析[J].中南大学学报:自然科学版,2009,40(5):1457-1464.
ZHOU De, YE Mei-xin, LUO Ru-deng. Mechanical analysis of through tied-arch composite bridge on high-speed railway[J]. Journal of Central South University: Science and Technology, 2009, 40(5): 1457-1464.(in Chinese)
[14] 郝 超.大跨度钢斜拉桥的施工监控及其目标精度值[J].中国公路学报,2003,16(1):54-57.
HAO Chao. Construction control and control precision goal of long-span steel cable-stayed bridge[J]. China Journal of Highway and Transport, 2003, 16(1): 54-57.(in Chinese)
[15] 余钱华.大跨混凝土桥梁施工监控中的应力分析与测试[J].中国公路学报,2008,21(2):68-73.
YU Qian-hua. Stress analysis and measurement of long-span concrete bridge in process of construction supervisory control[J]. China Journal of Highway and Transport, 2008, 21(2): 68-73.(in Chinese)
[16] 李小和,孙新锋,王民焕.铁路(60+128+60)m系杆拱连续梁施工技术[J].桥梁建设,2009(5):53-56.
LI Xiao-he, SUN Xin-feng, WANG Min-huan. Construction techniques for a(60+128+60)m tied arch and continuous girder bridge[J]. Bridge Construction, 2009(5): 53-56.(in Chinese)
[17] 丁 岩.高速铁路尼尔森体系系杆拱桥设计参数分析及调索研究[D].长沙:长沙理工大学,2010.
DIN Yan. Analysis of structural parameters cable tension optimization of tied-arch bridge of Nielsen system in high-speed railway[D]. Changsha: Changsha University of Science and Technology, 2010.(in Chinese)
[18] 田仲初,丁 岩,蒋田勇.高速铁路尼尔森体系系杆拱桥徐变变形影响因素[J].长沙理工大学学报:自然科学版,2010,7(2):25-32.
TIAN Zhong-chu, DIN Yan, JIANG Tian-yong. Influencing factors on creep deformation of tied-arch bridge of Nielsen system in high-speed railway[J]. Journal of Changsha University of Science and Technology: Natural Science, 2010, 7(2): 25-32.(in Chinese)