[1] 牛 宏.大跨度连续刚构桥建设期风险分析研究[D].西安:长安大学,2009.
NIU Hong. Risk analysis research for long-span continuous rigid-frame bridge during construction[D]. Xi'an: Chang'an University, 2009.(in Chinese)
[2] 龚俊虎,王华成,黄北平.V形刚构拱组合桥的梁拱组合效应分析[J].铁道工程学报,2010,27(6):61-64,78.
GONG Jun-hu, WANG Hua-cheng, HUANG Bei-ping. Analysis of combination effect of beam-arch of V-shaped rigid-frame and arch structure combined bridge[J]. Journalof Railway Engineering Society, 2010, 27(6): 61-64, 78.(in Chinese)
[3] 龚俊虎.大跨度V形墩连续刚构与拱组合桥受力特性研究[D].成都:西南交通大学,2009.
GONG Jun-hu. Research on mechanical characteristics of combined bridge of V-shaped pier rigid-frame and arch structure[D]. Chengdu: Southwest Jiaotong University, 2009.(in Chinese)
[4] 王战国,俞亚南,偶昌宝.大跨度预应力V形墩连续刚构桥线形施工控制[J].武汉理工大学学报:交通科学与工程版,2006,30(3):504-507.
WANG Zhan-guo, YU Ya-nan, OU Chang-bao. A lignment control analysis of a prestressed-concrete V-shape pier continu-ous rigid frame bridge[J]. Journal of Wuhan University of Technology: Transportation Science and Engineering, 2006, 30(3): 504-507.(in Chinese)
[5] 陈后军.高速铁路V形钢箱连续梁桥设计研究[D].上海:同济大学,2006.
CHEN Hou-jun. Research on designing scheme for V-shaped continuous steel box girder bridge in high-speed railway[D]. Shanghai: Tongji University, 2006.(in Chinese)
[6] 曹 峰.V型支撑预应力钢筋混凝土连续刚构桥空间效应分析及其试验研究[D].西安:长安大学,2009.
CAO Feng. V-supported prestressed concrete continuous rigid frame bridge spatial analysis and experimental study[D]. Xi'an: Chang'an University, 2009.(in Chinese)
[7] 黄海燕,麻荣永.大坝安全模糊风险分析初探[J].广西大学学报:自然科学版,2003,28(1):14-18.
HUANG Hai-yan, MA Rong-yong. Preliminary study on fuzzy risk analysis of dam safety[J]. Journal of Guangxi University: Natural Science Edition, 2003, 28(1): 14-18.(in Chinese)
[8] WANG Ying-ming, ELHAG T M S. A comparison of neural network, evidential reasoning and multiple regression analysis in modelling bridge risks[J]. Expert Systems with Applications, 2007, 32(2): 336-348.
[9] WANG Ying-ming, LIU Jun, ELHAG T M S. An integrated AHP-DEA methodology for bridge risk assessment[J]. Computers and Industrial Engineering, 2008, 54(4): 513-525.
[10] ERTAY T, RUAN D, TUZKAYA U R. Integrating data envelopment analysis and analytic hierarchy for the facility layout design in manufacturing systems[J]. Information Sciences, 2006, 176(3): 237-262.
[11] 包龙生,刘克同,于 玲,等.基于灰色层次分析法的桥梁施工方案多目标风险分析及评价[J].沈阳建筑大学学报:自然科学版,2009,25(4):663-669.
BAO Long-sheng, LIU Ke-tong, YU Ling, et al. Multi-objective risk analysis and documents assessment of bridge construction based on AHP-GRAY[J]. Journal of Shenyang Jianzhu University: Natural Science, 2009, 25(4): 663-669.(in Chinese)
[12] 孙方田,马一太,李敏霞.基于灰色-层次理论的热水器综合评价研究[J].太阳能学报,2008,29(2):204-208.
SUN Fang-tian, MA Yi-tai, LI Min-xia. Comprehensive evaluation of water heater based on the grey-analytic hierarchy theory[J]. Acta Energiae Solaris Sinica, 2008, 29(2): 204-208.(in Chinese)
[13] 单德山,李 乔,张吉刚.蒙特卡罗法在桥梁损伤识别中的应用[J].重庆交通大学学报:自然科学版,2009,28(5):844-847.
SHAN De-shan, LI Qiao, ZHANG Ji-gang. Application of Monte-Carlo method to bridge damage identification[J]. Journal of Chongqing Jiaotong University: Natural Science, 2009, 28(5): 844-847.(in Chinese)
[14] 冯清海,袁万城.BP神经网络和RBF神经网络在墩柱抗震性能评估中的比较研究[J].结构工程师,2007,23(5):41-47,69.
FENG Qing-hai, YUAN Wan-cheng. Comparative study on BP neural network and RBF neural network in performance evaluation of seismic resistance for pier columns[J]. Structural Engineers, 2007, 23(5): 41-47, 69.(in Chinese)
[15] 刘兆惠.基于灰色-径向基函数神经网络的交通事故多元预测模型[J].交通运输工程学报,2009,9(5):94-98.
LIU Zhao-hui. Multifactor prediction model for traffic accident based on grey-radial basis function neural network[J]. Journal of Traffic and Transportation Engineering, 2009, 9(5): 94-98.(in Chinese)
[16] 张 涛,赵登福,周 琳,等.基于RBF神经网络和专家系统的短期负荷预测方法[J].西安交通大学学报,2001,35(4):331-334.
ZHANG Tao, ZHAO Deng-fu, ZHOU Lin, et al. Short-term load forecasting using radial basis function networks and expert system[J]. Journal of Xi'an Jiaotong University, 2001, 35(4): 331-334.(in Chinese)
[17] 王立峰,肖子旺,王子强.基于RBF神经网络的V撑施工过程风险分析[J].武汉理工大学学报,2011,33(5):137-141.
WANG Li-feng, XIAO Zi-wang, WANG Zi-qiang. Risk analysis of V-shaped pier in construction process by means of RBF artificial neural network[J]. Journal of Wuhan University of Technology, 2011, 33(5): 137-141.(in Chinese)
[18] 王 峙,范 飞.工程机械融资租赁的风险控制[J].筑路机械与施工机械化,2012,29(1):82-84.
WANG Zhi, FAN Fei. Risk control of financial leasing of construction machinery[J]. Road Machinery and Construction Mechanization, 2012, 29(1): 82-84.(in Chinese)
[19] 黄玲玉.大跨度V形墩连续刚构拱组合桥结合部模型试验研究[D].成都:西南交通大学,2006.
HUANG Ling-yu. Model testing study on the node of combined bridge of V-shaped pier rigid-frame and arch structure[D]. Chengdu: Southwest Jiaotong University, 2006.(in Chinese)
[20] 邹纪民.浙江东阳江大桥V形墩施工[J].公路,2002(12):14-15.
ZOU Ji-min. V-shaped pier construction of Dongyang River Bridge of Zhejiang[J]. Highway, 2002(12): 14-15.(in Chinese)
[21] 李国亮,刘 钊.V形刚构桥施工中倒三角区域支架的拆除时机分析[J].公路交通科技,2005,22(8):95-97,101.
LI Guo-liang, LIU Zhao. Study on the demolishment sequence of scaffolds for the inverted-triangle area of the rigid-frame bridges with V-piers[J].Journal of Highway and Transportation Research and Development, 2005, 22(8): 95-97, 101.(in Chinese)