[1] MAKKINGA F, METSELAAR S. Automatic conflict detection and decision support for optimal usage of railway infrastructure[C]∥ALLAN J, HILL R J, BREBBIA C A, et al. Seventh International Conference on Computers in Railways VII. Southampton: WIT Press, 2000: 1057-1064.
[2] GOVERDE R M P, HANSEN I A. TNV-prepare: analysis of dutch railway operations based on train detection data[C]∥ALLAN J, HILL R J, BREBBIA C A, et al. Seventh International Conference on Computers in Railways VII. Southampton: WIT Press, 2000: 779-788.
[3] YUAN Jian-xin, HANSEN I A.Optimizing capacity utilization of stations by estimating knock-on train delays[J]. Transportation Research Part B: Methodological, 2007, 41(2): 202-217.
[4] GOVERDE R M P. Railway timetable stability analysis using max-plus system theory[J]. Transportation Research Part B: Methodological, 2007, 41(2): 179-201.
[5] ALEXANDER F. A fuzzy knowledge-based system for railway traffic control[J]. Engineering Applications of Artificial Intelligence, 2000, 13(6): 719-729.
[6] OH S M, HONG S H, CHOI I C. Railway conflict detection and resolution in the Korean railway system[C]∥ALLAN J, HILL R J, BREBBIA C A, et al. Seventh International Conference on Computers in Railways IX. Southampton: WIT Press, 2004: 675-684.
[7] JOHANNA T. Computer-based decision support for railway traffic scheduling and dispatching: a review of models and algorithms[C]∥KROON L G, ROLF H M. The 5th Workshop on Algorithmic Methods and Models for Optimization of Railways. Wadern: Leibniz Center for Informatics, 2006: 1-23.
[8] MOZZARELLA M, OTTAVIANI E. A traffic management system for real-time traffic optimization in railways[J]. Transportation Research Part B: Methodological, 2007, 41(2): 246-274.
[9] TSANG C W, HO T K. The conflict resolution at connected railway junctions[C]∥IU V P, LAMAS L N, LI Y P, et al. Proceedings of the 9th International Conference EPMESC IX. New York: Taylor and Francis, 2003: 987-993.
[10] D'ARIANO A, PRANZO M, HANSEN I A. Conflict resolution and train speed coordination for solving real-time timetable perturbations[J]. IEEE Transactions on Intelligent Transportation System, 2007, 8(2): 208-222.
[11] ALBRECHT T. The Influence of anticipating train driving on the dispatching process in railway conflict situations[J]. Networks and Spatial Economics, 2009, 9(1): 85-101.
[12] CHENG Y H, YANG Li-an. A fuzzy petri nets approach for railway traffic control in case of abnormality: evidence from Taiwan railway system[J]. Expert Systems with Applications, 2009, 36(4): 8040-8048.
[13] 聂 磊,张星臣,赵 鹏,等.高速铁路列车运行计划调整策略的研究[J].铁道学报,2001,23(4):1-6.
NIE Lei, ZHANG Xing-chen, ZHAO Peng, et al. Study on the strategy of train operation adjustment on high speed railway[J]. Journal of the China Railway Society, 2001, 23(4): 1-6.(in Chinese)
[14] 史 峰,黎新华,秦 进,等.单线列车运行调整的最早冲突优化方法[J].中国铁道科学,2005,26(1):106-113.
SHI Feng, LI Xin-hua, QIN Jin, et al. The earliest conflict optimal method for train operation adjustment on single track railway[J]. China Railway Science, 2005, 26(1): 106-113.(in Chinese)
[15] 文 超,彭其渊,文 欢.高速铁路列车运行冲突管理研究现状综述[J].中国安全科学学报,2010,20(5):140-150.
WEN Chao, PENG Qi-yuan, WEN Huan. Review on conflict management of train operation on high-speed railway[J]. China Safety Science Journal, 2010, 20(5): 140-150.(in Chinese)
[16] 文 超,彭其渊,陈芋宏.高速铁路列车运行冲突管理总论[J].中国安全科学学报,2010,20(10):8-12.
WEN Chao, PENG Qi-yuan, CHEN Yu-hong. Pandect on the operation conflict management of high-speed train[J]. China Safety Science Journal, 2010, 20(10): 8-12.(in Chinese)
[17] 田 钊.基于一类混合Petri网的列车运行系统中冲突因素的分析[D].郑州:郑州大学,2011.
TIAN Zhao. Conflict analysis of train operation system based on a class of hybrid Petri nets[D]. Zhengzhou: Zhengzhou University, 2011.(in Chinese)
[18] 陈荣武,刘 莉,郭 进.基于遗传算法的列车运行能耗优化算法[J].交通运输工程学报,2012,12(1):108-114.
CHEN Rong-wu, LIU Li, GUO Jin. Optimization algorithm of train operation energy consumption based on genetic algorithm[J]. Journal of Traffic and Transportation Engineering, 2012, 12(1): 108-114.(in Chinese)
[19] 周文梁,史 峰,陈 彦,等.客运专线网络列车开行方案与运行图综合优化方法[J].铁道学报,2011,33(2):1-7.
ZHOU Wen-liang, SHI Feng, CHEN Yan, et al. Method of integrated optimization of train operation plan and diagram for network of dedicated passenger lines[J]. Journal of the China Railway Society, 2011, 33(2): 1-7.(in Chinese)
[20] 贾晓秋,关晓宇.列车运行图布线方法研究[J].铁道运输与经济,2011,33(4):81-84.
JIA Xiao-qiu, GUAN Xiao-yu. Research on routing method of train operation diagram[J]. Railway Transport and Economy, 2011, 33(4): 81-84.(in Chinese)
[21] 周 伟,秦世引,万百五.列车运行调整问题研究现状及发展趋势[J].系统工程,1997,15(2):17-22.
ZHOU Wei, QIN Shi-yin, WAN Bai-wu. The train operation adjustment: current status and prospects[J]. Systems Engin-eering, 1997, 15(2): 17-22.(in Chinese)
[22] 金福才,胡思继,刘智丽.列车运行调整方案实时安全诊断算法研究[J].中国安全科学学报,2004,14(1):53-56.
JIN Fu-cai, HU Si-ji, LIU Zhi-li. Real-time safety diagnosis algorithm of train operation adjustment plan[J]. China Safety Science Journal, 2004, 14(1): 53-56.(in Chinese)
[23] 周学松,朱 钰,胡思继.基于列车运行状态推导图的列车运行调整算法[J].铁道学报,1999,21(6):1-5.
ZHOU Xue-song, ZHU Yu, HU Si-ji. Research on the algorithm for train regulation based on train running state derivation graph[J]. Journal of the China Railway Society, 1999, 21(6): 1-5.(in Chinese)