参考文献/References:
[1] 陈 越,陈伟乐,宋神友,等.深中通道沉管隧道主要建造技术[J].隧道建设(中英文),2020,40(4):603-610.
CHEN Yue, CHEN Wei-le, SONG Shen-you, et al. Key construction technologies for immersed tunnel of Shenzhen-Zhongshan Link[J]. Tunnel Construction, 2020, 40(4): 603-610.(in Chinese)
[2] 袁 勇,禹海涛,萧文浩,等.沉管隧道管节接头混凝土剪力键压剪破坏试验研究[J].工程力学,2017,34(3):149-154,181.
YUAN Yong, YU Hai-tao, XIAO Wen-hao, et al.Experimental failure analysis on concrete shear keys in immersion joint subjected to compression-shear loading[J]. Engineering Mechanics, 2017, 34(3): 149-154, 181.(in Chinese)
[3] 程新俊,景立平,崔 杰,等.沉管隧道管节接头剪切破坏试验[J].中国公路学报,2020,33(4):99-105.
CHENG Xin-jun, JING Li-ping, CUI Jie, et al. Experimental failure analysis on immersed tunnel joint subjected to shear loading[J]. China Journal of Highway and Transport, 2020, 33(4): 99-105.(in Chinese)
[4] 成益品,陈伟乐,宋神友,等.深中通道沉管安装测量塔法浮态标定与坐底标定精度对比试验[J].隧道建设(中英文),2021,41(8):1399-1403.
CHENG Yi-pin, CHEN Wei-le, SONG Shen-you, et al. Calibration accuracy comparison between floating state of measuring tower and coordinate bottom for immersed-tube installation in Shenzhen-Zhongshan Link[J]. Tunnel Construction, 2021, 41(8): 1399-1403.(in Chinese)
[5] 禹海涛,萧文浩,赵 旭,等.沉管隧道柔性接头压缩性能研究[J].中国公路学报,2019,32(5):115-122,180.
YU Hai-tao, XIAO Wen-hao, ZHAO Xu, et al. Compression performance of flexible joints in immersed tunnels[J]. China Journal of Highway and Transport, 2019, 32(5): 115-122, 180.(in Chinese)
[6] 张清华,李 乔.锚箱式索梁锚固结构受力特性研究Ⅰ:理论模型[J].土木工程学报,2012,45(7):120-126.
ZHANG Qing-hua, LI Qiao. Mechanical features of cable-girder anchorage for cable-stayed bridges with steel box girdersⅠ: theoretical model[J]. China Civil Engineering Journal, 2012, 45(7): 120-126.(in Chinese)
[7] 孟俊苗,刘永健,王 兴.组合梁斜拉桥索梁锚固区桥面板斜向开裂机理与配筋设计方法[J].交通运输工程学报,2022,22(6):114-129.
MENG Jun-miao, LIU Yong-jian, WANG Xing. Diagonal cracking mechanism and reinforcement design method of bridge decks in cable-girder anchorage zone of composite girder cable-stayed bridge[J]. Journal of Traffic and Transportation Engineering, 2022, 22(6): 114-129.(in Chinese)
[8] 任伟平,强士中,李小珍,等.斜拉桥锚拉板式索梁锚固结构传力机理及疲劳可靠性研究[J].土木工程学报,2006,39(10):68-73,91.
REN Wei-ping, QIANG Shi-zhong, LI Xiao-zhen, et al.Mechanical behavior and fatigue reliability of tensile anchor plate structure in the cable-beam anchorage zones of cable-stayed bridges[J]. China Civil Engineering Journal, 2006, 39(10): 68-73, 91.(in Chinese)
[9] 刘宝峰,高建辉,杨 磊,等.黑瞎子岛乌苏大桥索梁锚固结构模型静力试验研究[J].桥梁建设,2013,43(6):13-18.
LIU Bao-feng, GAO Jian-hui, YANG Lei, et al.Test study of static force of cable-to-girder anchorage structure model of Wusu Bridge in Heixiazi Island[J]. Bridge Construction, 2013, 43(6): 13-18.(in Chinese)
[10] 卫 星,李小珍,李 俊,等.钢箱梁斜拉桥锚拉板式索梁锚固结构的试验研究[J].工程力学,2007,24(4):135-141.
WEI Xing, LI Xiao-zhen, LI Jun, et al.Experimental study on anchor-plate anchorage for cable-stayed bridges with steel box girder[J]. Engineering Mechanics, 2007, 24(4): 135-141.(in Chinese)
[11] 陈彦江,辛光涛,李 勇,等.锚拉板式索梁锚固区足尺模型承载性能试验研究[J].桥梁建设,2014,44(3):38-43.
CHEN Yan-jiang, XIN Guang-tao, LI Yong, et al. Test study of bearing behavior of full-scale model for cable-to-girder anchorage zone of tensile anchor plate type[J]. Bridge Construction, 2014, 44(3): 38-43.(in Chinese)
[12] 周绪红,张 茜,狄 谨,等.对称荷载作用钢锚板式钢-混组合索塔锚固体系传力机理[J].中国公路学报,2012,25(6):60-67.
ZHOU Xu-hong, ZHANG Qian, DI Jin, et al. Load-transfer mechanism of steel-concrete composite cable-pylon anchorage system with steel anchor slab under symmetrical load[J]. China Journal of Highway and Transport, 2012, 25(6): 60-67.(in Chinese)
[13] NIE Jian-guo, ZHOU Meng, WANG Yu-hang, et al.Cable anchorage system modeling methods for self-anchored suspension bridges with steel box girders[J]. Journal of Bridge Engineering, 2014, 19(2): 172-185.
[14] NIE Jian-guo, TAO Mu-xuan, FAN Jian-sheng. Research on cable anchorage systems for self-anchored suspension bridges with steel box girders[J]. Journal of Bridge Engineering, 2011, 16(5): 633-643.
[15] 狄 谨,曾 奎,涂 熙,等.鹅公岩轨道专用桥主缆锚固区模型试验研究[J].桥梁建设,2018,48(6):58-63.
DI Jin, ZENG Kui, TU Xi, et al.Model test study of main cable anchorage zone of Egongyan Rail Transit Special Use Bridge[J]. Bridge Construction, 2018, 48(6): 58-63.(in Chinese)
[16] 沈锐利,谢 博.钢-混凝土组合梁自锚式悬索桥主缆锚固区传力机制研究[J].建筑结构学报,2017,38(增1):423-429.
SHEN Rui-li, XIE Bo.Force transfer mechanism in main cable anchorage zone of composite girder self-anchored suspension bridge[J]. Journal of Building Structures, 2017, 38(S1): 423-429.(in Chinese)
[17] 闫 磊,韩 恒,贺拴海,等.深中通道沉管临时锚拉系统承载性能足尺模型试验[J].中国公路学报,2022,35(10):47-54.
YAN Lei, HAN Heng, HE Shuan-hai, et al. Full-scale model test of bearing capacity of temporary anchorage system for immersed tube in Shenzhen-Zhongshan Link[J]. China Journal of Highway and Transport, 2022, 35(10): 47-54.(in Chinese)
[18] 李瀚源,李兴高.沉管隧道管节接头三维数值模拟分析[J].地下空间与工程学报,2019,15(增1):120-128.
LI Han-yuan, LI Xing-gao. 3-D numerical simulation analysis on element joint in immersed tube tunnels[J]. Chinese Journal of Underground Space and Engineering, 2019, 15(S1): 120-128.(in Chinese)
[19] 赵天驰,丁文其,魏立新,等.考虑地基刚度不均匀影响的沉管隧道接头变形分析[J].现代隧道技术,2018,55(5):97-105,114.
ZHAO Tian-chi, DING Wen-qi, WEI Li-xin, et al.Analysis on the deformation behavior of joints in immersed tube tunnels considering the non-uniformity of ground stiffness[J]. Modern Tunnelling Technology, 2018, 55(5): 97-105, 114.(in Chinese)
[20] 禹海涛,袁 勇,刘洪洲,等.沉管隧道接头力学模型及刚度解析表达式[J].工程力学,2014,31(6):145-150.
YU Hai-tao, YUAN Yong, LIU Hong-zhou, et al. Mechanical model and analytical solution for stiffness in the joints of an immersed-tube tunnel[J]. Engineering Mechanics, 2014, 31(6): 145-150.(in Chinese)
[21] 禹海涛,萧文浩,袁 勇,等.沉管隧道接头与管节本体刚度比试验[J].中国公路学报,2016,29(12):134-141.
YU Hai-tao, XIAO Wen-hao, YUAN Yong, et al. Experiment on stiffness ratio of immersion joint to immersed tunnel element[J]. China Journal of Highway and Transport, 2016, 29(12): 134-141.(in Chinese)
[22] 冯海暴,刘德进.超大沉管隧道管节水下顶推精确调整受力运动规律分析[J].应用力学学报,2019,36(6):1405-1411.
FENG Hai-bao, LIU De-jin. Analysis of the law of the force and motion of the super large immersed tunnel elements during the underwater pushing and precise adjustment[J]. Chinese Journal of Applied Mechanics, 2019, 36(6): 1405-1411.(in Chinese)
[23] 周桓竹,寇晓强,王延宁.潮汐作用下的沉管隧道竖向位移计算[J].岩土力学,2021,42(10):2785-2794,2807.
ZHOU Huan-zhu, KOU Xiao-qiang, WANG Yan-ning. Vertical displacement calculation of immersed tube tunnel under tidal load[J]. Rock and Soil Mechanics, 2021, 42(10): 2785-2794, 2807.(in Chinese)
[24] 刘 鹏,丁文其,杨 波.沉管隧道接头刚度模型研究[J].岩土工程学报,2013,35(增2):133-139.
LIU Peng, DING Wen-qi, YANG Bo. Model for stiffness of joints of immersed tube tunnel[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(S2): 133-139.(in Chinese)
[25] 李军军,杨小军,李 芸,等.水流作用下的沉管平移控制模型与优化方法[J].交通运输工程学报,2016,16(2):27-36.
LI Jun-jun, YANG Xiao-jun, LI Yun, et al. Translation control model and optimization method of immersed tube under action of water flow[J]. Journal of Traffic and Transportation Engineering, 2016, 16(2): 27-36.(in Chinese)
[26] 何 杰,高正荣,辛文杰.港珠澳大桥沉管隧道合拢口水动力条件数值模拟研究[J].工程科学与技术,2019,51(6):68-74.
HE Jie, GAO Zheng-rong, XIN Wen-jie. Numerical simulation of hydrodynamic conditions on closure gap of immersed tunnel in Hong Kong-Zhuhai-Macao Bridge[J]. Advanced Engineering Sciences, 2019, 51(6):68-74.(in Chinese)
[27] 李 斌,高 潮,张嘉莹.港珠澳大桥沉管隧道瞬时沉降规律分析[J].岩土工程学报,2021,43(增2):263-266.
LI Bin, GAO Chao, ZHANG Jia-ying.Instantaneous settlement of immersed tube tunnel of Hong Kong-Zhuhai-Macao Bridge[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(S2): 263-266.(in Chinese)
[28] 唐 亮,樊健生,聂建国,等.角钢连接件力学性能及混凝土脱空对其影响研究[J].工程力学,2020,37(10):45-55,115.
TANG Liang, FAN Jian-sheng, NIE Jian-guo, et al.Experimental study on the mechanical performance of angle shear connectors with and without concrete gaps[J]. Engineering Mechanics, 2020, 37(10): 45-55, 115.(in Chinese)
[29] 严松宏,高 波,潘昌实.地震作用下沉管隧道接头力学性能分析[J].岩石力学与工程学报,2003,22(2):286-289.
YAN Song-hong, GAO Bo, PAN Chang-shi. Dynamic property analysis on joint for submerged tunnel under earthquake[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(2): 286-289.(in Chinese)
[30] 宋神友,李永轩,金文良,等.钢-混凝土组合沉管结构抗剪机理[J].同济大学学报(自然科学版),2019,47(10):1421-1428.
SONG Shen-you, LI Yong-xuan, JIN Wen-liang, et al. Shear mechanism of steel-concrete composite tunnel structure[J]. Journal of Tongji University(Natural Science), 2019, 47(10): 1421-1428.(in Chinese)
相似文献/References:
[1]吴庆雄,陈康明,陈宝春,等.凸形钢箱拱肋截面荷载试验和有限元分析[J].交通运输工程学报,2012,12(03):19.
WU Qing-xiong,CHEN Kang-ming,CHEN Bao-chun,et al.Loading test and finite element analysis on convex steel box section of arch rib[J].Journal of Traffic and Transportation Engineering,2012,12(05):19.
[2]王立峰,肖子旺,张振伟,等.大角度V撑蝶形拱式连续梁桥施工风险分析[J].交通运输工程学报,2012,12(03):28.
WANG Li-feng,XIAO Zi-wang,ZHANG Zhen-wei,et al.Construction risk analysis of butterfly arch continuous girder bridge with large angle V-shaped pier[J].Journal of Traffic and Transportation Engineering,2012,12(05):28.
[3]李 刚,贺拴海,杜 凯,等.桥梁下部结构裂缝提取的改进C-V模型算法[J].交通运输工程学报,2012,12(04):9.
LI Gang,HE Shuan-hai,DU Kai,et al.Modified C-V model algorithm of crack extraction for bridge substructure[J].Journal of Traffic and Transportation Engineering,2012,12(05):9.
[4]李永乐,李 鑫,向活跃,等.大跨度钢桁梁斜拉桥风-车-桥系统耦合振动[J].交通运输工程学报,2012,12(05):22.
LI Yong-le,LI Xin,XIANG Huo-yue,et al.Coupling vibration of wind-vehiche-bridge system for long-span steel truss cable-stayed bridge[J].Journal of Traffic and Transportation Engineering,2012,12(05):22.
[5]任文峰,王星华,涂 鹏.高速铁路系杆拱桥先拱后梁施工仿真与监测[J].交通运输工程学报,2012,12(05):28.
REN Wen-feng,WANG Xing-hua,TU Peng.Simulation and monitoring of high-speed railway tied-arch bridge construction with arch first and beam late method[J].Journal of Traffic and Transportation Engineering,2012,12(05):28.
[6]张 茜,狄 谨,周绪红.闭口肋加劲板屈曲临界应力计算方法[J].交通运输工程学报,2012,12(05):37.
ZHANG Qian,DI Jin,ZHOU Xu-hong.Calculation method of critical buckling stress forstiffened plate with closed ribs[J].Journal of Traffic and Transportation Engineering,2012,12(05):37.
[7]王春生,袁卓亚,郭晓宇,等.钢板-混凝土组合加固混凝土T梁的抗弯性能试验[J].交通运输工程学报,2010,10(06):32.
WANG Chun-sheng,YUAN Zhuo-ya,GUO Xiao-yu,et al.Flexural behavior experiment of reinforced concrete T-beams withsteel plate-concrete composite strengthening[J].Journal of Traffic and Transportation Engineering,2010,10(05):32.
[8]闫 斌,戴公连,董林育.客运专线斜拉桥梁轨相互作用设计参数[J].交通运输工程学报,2012,12(01):31.
YAN Bin,DAI Gong-lian,DONG Lin-yu.Design parameters of track-bridge interaction on passenger dedicated line cable-stayed bridge[J].Journal of Traffic and Transportation Engineering,2012,12(05):31.
[9]闫 磊,张雪林,贺拴海.抗力分项系数双重迭代求解算法(英文)[J].交通运输工程学报,2011,11(03):1.
YAN Lei,ZHANG Xue-lin,HE Shuan-hai.Double iteration solving method of resistance partial factor[J].Journal of Traffic and Transportation Engineering,2011,11(05):1.
[10]王全录,刘保东,杨成栋,等.回填施工对覆土波纹钢板拱桥受力性能的影响[J].交通运输工程学报,2011,11(03):22.
WANG Quan-lu,LIU Bao-dong,YANG Cheng-dong,et al.Influence of backfilling construction on mechanical performance for soil-covered corrugated steel arch bridge[J].Journal of Traffic and Transportation Engineering,2011,11(05):22.