[1]林上顺,林永捷,夏樟华,等.现浇ECC和预制榫卯混合连接装配式RC桥墩抗震性能[J].交通运输工程学报,2023,23(05):104-117.[doi:10.19818/j.cnki.1671-1637.2023.05.006]
 LIN Shang-shun,LIN Yong-jie,XIA Zhang-hua,et al.Anti-seismic performance of cast-in-place ECC and prefabricated mortise-tenon hybrid connection assembled RC bridge piers[J].Journal of Traffic and Transportation Engineering,2023,23(05):104-117.[doi:10.19818/j.cnki.1671-1637.2023.05.006]
点击复制

现浇ECC和预制榫卯混合连接装配式RC桥墩抗震性能()
分享到:

《交通运输工程学报》[ISSN:1671-1637/CN:61-1369/U]

卷:
第23卷
期数:
2023年05期
页码:
104-117
栏目:
道路与铁道工程
出版日期:
2023-11-10

文章信息/Info

Title:
Anti-seismic performance of cast-in-place ECC and prefabricated mortise-tenon hybrid connection assembled RC bridge piers
文章编号:
1671-1637(2023)05-0104-14
作者:
林上顺1林永捷1夏樟华2赵锦冰3黎雅乐4
(1.福建理工大学 福建省土木工程新技术与信息化重点实验室,福建 福州 350118; 2.福州大学 土木工程学院,福建 福州 350108; 3.皓耀时代(福建)集团有限公司,福建 福州 350108; 4.江苏开放大学 建筑工程学院,江苏 南京 210036)
Author(s):
LIN Shang-shun1 LIN Yong-jie1 XIA Zhang-hua2 ZHAO Jin-bing3 LI Ya-le4
(1. Fujian Provincial Key Laboratory of Advanced Technology and Information in Civil Engineering, Fujian University of Technology, Fuzhou 350118, Fujian, China; 2. School of Civil Engineering, Fuzhou University, Fuzhou 350108, Fujian, China; 3. Haoyao Times(Fujian)Group Co., Ltd., Fuzhou 350108, Fujian, China; 4. Department of Building Engineering, Jiangsu Open University, Nanjing 210036, Jiangsu, China)
关键词:
桥梁工程 装配式桥墩 拟静力试验 榫卯混合接头 工程水泥基复合材料 抗震性能
Keywords:
bridge engineering assembled bridge pier quasi-static test mortise-tenon hybrid connection engineered cementitious composite anti-seismic performance
分类号:
U443.22
DOI:
10.19818/j.cnki.1671-1637.2023.05.006
文献标志码:
A
摘要:
为提高装配式钢筋混凝土(RC)桥墩的抗震性能,提出采用现浇工程水泥基复合材料(ECC)和预制榫卯混合连接的新型接头构造; 开展了3个采用混合接头连接(以现浇ECC段高度与凹槽深度为变化参数,编号为DZ-1、AC-200、XJ-250)和1个采用现浇ECC湿接缝连接(编号为PT-1)的装配式RC桥墩试件的拟静力试验; 建立了经试验验证的ABAQUS有限元模型,分析了轴压比、长细比、凹槽深度、现浇ECC段高度等参数对装配式RC桥墩抗震性能的影响。分析结果表明:4个桥墩试件破坏模式均为压弯破坏,且各试件的ECC现浇段均未发生破坏; 与PT-1试件相比,现浇ECC和预制榫卯混合连接装配式RC桥墩的峰值荷载增大了25.74%~30.03%,极限位移增大了22.75%~106.39%,残余位移下降了43.70%~61.42%,具有较好的抗震性能; AC-200试件的凹槽深度最大,其残余位移大于其他装配式桥墩,且耗能能力较差; 装配式桥墩的峰值荷载和屈服荷载随轴压比、现浇ECC段高度的提高而提高,随着长细比的提高而下降; 延性系数随着现浇ECC段高度的提高而提高,随着长细比、轴压比的提高而下降。建议混合连接的凹槽深度不宜超过凸榫边长的75%。
Abstract:
In order to improve the anti-seismic performance of assembled reinforced concrete(RC)bridge piers, a new connection configuration using a hybrid connection of cast-in-place engineered cementitious composites(ECC)and prefabricated mortise-tenon was proposed. Quasi-static tests of three assembled RC pier specimens using hybrid connections(with the height of cast-in-place ECC segments and depth of the notch as the varying parameters, No. DZ-1, AC-200, and XJ-250)and one assembled RC pier specimen using a cast-in-place ECC wet connection(No. PT-1)were carried out. A test validated ABAQUS finite element model was established, and the effects of parameters such as the axial compression ratio, length-to-slender ratio, depth of notch, and height of cast-in-place ECC segments on the anti-seismic performance of assembled RC bridge piers were analyzed. Analysis results show that the damage modes of the four pier specimens are all compression bending damage, and the cast-in-place ECC segments of each specimen are not damaged. Compared with the PT-1 specimen, the peak loads of assembled RC bridge piers with cast-in-place ECC and prefabricated mortise-tenon hybrid connection increase by 25.74%-30.03%, the ultimate displacement increase by 22.75%-106.39%, and the residual displacement decrease by 43.70%-61.42%, which indicates better anti-seismic performance. The AC-200 specimen has the largest depth of notch, and its residual displacement is larger than that of the other assembled bridge piers, with poorer energy dissipation capacity. The peak load and yield load of assembled bridge piers increase with the axial compression ratio and the height of cast-in-place ECC segments and decrease with the increase in the length-to-slender ratio. The ductility factor increases with the height of the cast-in-place ECC segment and decreases with the increase in the length-to-slender ratio and axial compression ratio. It is recommended that the depth of the notch in hybrid connections should not exceed 75% of the side length of the tenon. 7 tabs, 21 figs, 30 refs.

参考文献/References:

[1] 黄云青,赵建锋.不同连接方式对预制拼装桥墩抗震性能的影响[J].青岛理工大学学报,2019,40(6):38-43.
HUANG Yun-qing, ZHAO Jian-feng. Influence of different connection modes on seismic performance of precast segmental assembly bridge pier[J]. Journal of Qingdao University of Technology, 2019, 40(6): 38-43.(in Chinese)
[2] 魏红一,肖 纬,王志强,等.采用套筒连接的预制桥墩抗震性能试验研究[J].同济大学学报(自然科学版),2016,44(7):1010-1016.
WEI Hong-yi, XIAO Wei, WANG Zhi-qiang, et al. Experimental study on seismic performance of precast bridge pier with grouted splice sleeve[J]. Journal of Tongji University(Natural Science), 2016, 44(7): 1010-1016.(in Chinese)
[3] 谭逸波,谭 昱,陈儒发,等.分节式预制墩身干接缝施工关键技术应用研究[J].公路,2015,60(11):83 -86.
TAN Yi-bo, TAN Yu, CHEN Ru-fa, et al. Application research on key technology of dry joint construction of segmented precast pier body[J]. Highway, 2015,60(11): 83-86.(in Chinese)
[4] 王志强,葛继平,魏红一,等.节段拼装桥墩抗震性能研究进展[J].地震工程与工程振动,2009,29(4):147-154.
WANG Zhi-qiang, GE Ji-ping, WEI Hong-yi, et al. Recent development in seismic research of segmental bridge columns[J]. Journal of Earthquake Engineering and Engineering Vibration, 2009, 29(4): 147-154.(in Chinese)
[5] 王景全,王 震,高玉峰,等.预制桥墩体系抗震性能研究进展:新材料、新理念、新应用[J].工程力学,2019,36(3):1-23.
WANG Jing-quan, WANG Zhen, GAO Yu-feng, et al. Review on aseismic behavior of precast bridge piers: new material, new concept, and new application[J]. Engineering Mechanics, 2019, 36(3): 1-23.(in Chinese)
[6] 林上顺,林永捷,夏樟华,等.不同拼接构造的装配式圆柱墩偏压性能试验[J].工业建筑,2022,52(4):91-97.
LIN Shang-shun, LIN Yong-jie, XIA Zhang-hua, et al. Experimental research on mechanical properties of prefabricated cylindrical piers with different splicing structures under eccentric compression[J]. Industrial Construction, 2022, 52(4): 91-97.(in Chinese)
[7] 欧智菁,谢铭勤,秦志清,等.带钢管剪力键的装配式混凝土桥墩抗震性能[J].西南交通大学学报,2021,56(6):1169-1175,1191.
OU Zhi-jing, XIE Ming-qin, QIN Zhi-qing, et al. Seismic performance test and FEM analysis of assembled concrete pier with sleeve and steel tube shear connector[J]. Journal of Southwest Jiaotong University, 2021, 56(6): 1169-1175, 1191.(in Chinese)
[8] 包龙生,张远宝,桑中伟,等.波纹管连接装配式桥墩抗震性能拟静力试验与数值模拟[J].中国公路学报,2018,31(12):242-249.
BAO Long-sheng, ZHANG Yuan-bao, SANG Zhong-wei, et al. Quasi-static test and numerical simulation analysis for seismic performance of fabricated assemble bridge piers base on bellows connection[J]. China Journal of Highway and Transport, 2018, 31(12): 242-249.(in Chinese)
[9] 包龙生,赵春艳,张远宝,等.预应力连接型装配式混凝土桥墩受力性能研究[J].广西大学学报(自然科学版),2021,46(1):29-41.
BAO Long-sheng, ZHAO Chun-yan, ZHANG Yuan-bao, et al. Study on mechanical properties of prestressed concrete bridge piers[J]. Journal of Guangxi University(Natural Science Edition), 2021, 46(1): 29-41.(in Chinese)
[10] 葛继平,夏樟华,江 恒.灌浆波纹管装配式桥墩双向拟静力试验[J].中国公路学报,2018,31(12):222-230.
GE Ji-ping, XIA Zhang-hua, JIANG Heng. Biaxial quasi-static experiment of precast segmental bridge piers with grouting corrugated pipe connection[J]. China Journal of Highway and Transport, 2018, 31(12): 222-230.(in Chinese)
[11] XIA Zhang-hua, LIN Shang-shun, HE Yong-bo, et al. Seismic performance of precast bridge columns connected with grouted corrugated-metal duct through biaxial quasi-static experiment and modeling[J]. Earthquake Engineering and Engineering Vibration, 2021, 20(3): 747- 770.
[12] 王志强,卫张震,魏红一,等.预制拼装联接件形式对桥墩抗震性能的影响[J].中国公路学报,2017,30(5):74-80.
WANG Zhi-qiang, WEI Zhang-zhen, WEI Hong-yi, et al. Influences of precast segmental connector forms on seismic performance of bridge pier[J]. China Journal of Highway and Transport, 2017, 30(5): 74-80.(in Chinese)
[13] 徐文靖,马 骉,黄 虹,等.套筒连接的预制拼装桥墩抗震性能研究[J].工程力学,2020,37(10):93-104.
XU Wen-jing, MA Biao, HUANG Hong, et al. The seismic performance of precast bridge piers with grouted sleeves[J]. Engineering Mechanics, 2020, 37(10): 93-104.(in Chinese)
[14] HABER Z B, MACKIE K R, AL-JELAWY H M. Testing and analysis of precast columns with grouted sleeve connections and shifted plastic hinging [J]. Journal of Bridge Engineering, 2017, 22(10): 04017078.
[15] 林上顺,林永捷,夏樟华,等.UHPC和预制榫卯混合连接装配式RC桥墩拟静力试验[J].桥梁建设,2023,53(1):16-23.
LIN Shang-shun, LIN Yong-jie, XIA Zhang-hua, et al. Quasi-static test of prefabricated segmental RC pier with hybrid UHPC and prefabricated mortise-tenon connections[J]. Bridge Construction, 2023, 53(1): 16-23.(in Chinese)
[16] LI V C, WU H C. MAALEJ M, et al. Tensile behavior of cement-based composites with random discontinuous steel fibers[J]. Journal of the American Ceramic Society, 1996, 79(1): 74-78.
[17] YANG E H, LI V C. Strain-hardening fiber cement optimization and component tailoring by means of a micromechanical model[J]. Construction and Building Materials, 2010, 24(2): 130-139.
[18] LI V C, MISHRA D K, WU H C. Matrix design for pseudo-strain-hardening fibre reinforced cementitious composites[J].Materials and Structures, 1995, 28(10): 586- 595.
[19] CAI Xu, HUANG Wen-ke, WU Kuang-huai. Study of the self-healing performance of semi-flexible pavement materials grouted with engineered cementitious composites mortar based on a non-standard test[J]. Materials, 2019, 12(21): 3488.
[20] 石 达,史才军,吴泽媚,等.基于水泥基材料组分的自愈合研究进展[J].材料导报,2021,35(7):7096-7106.
SHI Da, SHI Cai-jun, WU Ze-mei, et al. Advances in autogenous self-healing of cementitious materials[J]. Materials Reports, 2021, 35(7): 7096-7106.(in Chinese)
[21] 阚黎黎,曹 号,盛昊煜,等.用纳米压痕技术表征超高韧性水泥基复合材料(ECC)的裂缝自愈合特性[J].材料科学与工程学报,2016,34(3):394-399,444.
KAN Li-li, CAO Hao, SHENG Hao-yu, et al. Nanoindentation characterization of self-healing engineered cementitious composites(ECC)materials[J]. Journal of Materials Science and Engineering, 2016, 34(3): 394-399, 444.(in Chinese)
[22] 张志刚,张仁毅,张 沛,等.可自修复的高延性混凝土(ECC)在机场道面的适用性分析[J].重庆大学学报,2021,44(1):97-105.
ZHANG Zhi-gang, ZHANG Ren-yi, ZHANG Pei, et al. Feasibility study of engineered cementitious composites(ECC)with self-healing capacity for airfield pavement[J]. Journal of Chongqing University, 2021, 44(1): 97-105.(in Chinese)
[23] LI V C, WANG S, WU H C. Tensile strain-hardening behavior of PVA-ECC[J]. Materials Journal, 2011, 98(6): 483-492.
[24] KAMADA T, LI V C. The effects of surface preparation on the fracture behavior of ECC/concrete repair system[J]. Cement and Concrete Composites, 2000, 22(6): 423-431.
[25] 葛继平,闫兴非,王志强.灌浆套筒和预应力筋连接的预制拼装桥墩的抗震性能[J].交通运输工程学报,2018,18(2):42-52.
GE Ji-ping,YAN Xing-fei,WANG Zhi-qiang. Seismic performance of prefabricated assembled pier with grouted sleeve and prestressed reinforcements[J]. Journal of Traffic and Transportation Engineering, 2018, 18(2): 42-52.(in Chinese)
[26] 贾俊峰,魏 博,欧进萍,等.外置可更换耗能器的预制拼装自复位桥墩抗震性能试验研究[J].振动与冲击,2021,40(5):154-162.
JIA Jun-feng, WEI Bo, OU Jin-ping, et al. Tests for seismic performance of prefabricated self-centering bridge piers with external replaceable energy dissipator[J]. Journal of Vibration and Shock, 2021, 40(5): 154-162.(in Chinese)
[27] DAWOOD H, ELGAWADY M, HEWES J. Behavior of segmental precast posttensioned bridge piers under lateral loads[J]. Journal of Bridge Engineering, 2012, 17(5): 735-746.
[28] CAI Zhong-kui, WANG Zhen-yu, YANG T Y. Experimental testing and modeling of precast segmental bridge columns with hybrid normal- and high-strength steel rebars[J]. Construction and Building Materials, 2018, 166: 945- 955.
[29] 杜 亮.ECC材料基本力学性能研究[D].苏州:苏州科技学院,2019.
DU Liang. Experimental study on mechanical properties of ECC[D]. Suzhou: Suzhou University of Science and Technology, 2019.(in Chinese)
[30] 包龙生,王贺鑫,汤维维,等.采用榫卯剪力键的预应力装配式双柱桥墩拟静力分析[J].沈阳建筑大学学报(自然科学版),2018,34(4):692-702.
BAO Long-sheng, WANG He-xin, TANG Wei-wei, et al. Pseudo static analysis of assembly type double column pier based on ABAQUS[J]. Journal of Shenyang Jianzhu University(Natural Science), 2018, 34(4): 692-702.(in Chinese)

相似文献/References:

[1]吴庆雄,陈康明,陈宝春,等.凸形钢箱拱肋截面荷载试验和有限元分析[J].交通运输工程学报,2012,12(03):19.
 WU Qing-xiong,CHEN Kang-ming,CHEN Bao-chun,et al.Loading test and finite element analysis on convex steel box section of arch rib[J].Journal of Traffic and Transportation Engineering,2012,12(05):19.
[2]王立峰,肖子旺,张振伟,等.大角度V撑蝶形拱式连续梁桥施工风险分析[J].交通运输工程学报,2012,12(03):28.
 WANG Li-feng,XIAO Zi-wang,ZHANG Zhen-wei,et al.Construction risk analysis of butterfly arch continuous girder bridge with large angle V-shaped pier[J].Journal of Traffic and Transportation Engineering,2012,12(05):28.
[3]李 刚,贺拴海,杜 凯,等.桥梁下部结构裂缝提取的改进C-V模型算法[J].交通运输工程学报,2012,12(04):9.
 LI Gang,HE Shuan-hai,DU Kai,et al.Modified C-V model algorithm of crack extraction for bridge substructure[J].Journal of Traffic and Transportation Engineering,2012,12(05):9.
[4]李永乐,李 鑫,向活跃,等.大跨度钢桁梁斜拉桥风-车-桥系统耦合振动[J].交通运输工程学报,2012,12(05):22.
 LI Yong-le,LI Xin,XIANG Huo-yue,et al.Coupling vibration of wind-vehiche-bridge system for long-span steel truss cable-stayed bridge[J].Journal of Traffic and Transportation Engineering,2012,12(05):22.
[5]任文峰,王星华,涂 鹏.高速铁路系杆拱桥先拱后梁施工仿真与监测[J].交通运输工程学报,2012,12(05):28.
 REN Wen-feng,WANG Xing-hua,TU Peng.Simulation and monitoring of high-speed railway tied-arch bridge construction with arch first and beam late method[J].Journal of Traffic and Transportation Engineering,2012,12(05):28.
[6]张 茜,狄 谨,周绪红.闭口肋加劲板屈曲临界应力计算方法[J].交通运输工程学报,2012,12(05):37.
 ZHANG Qian,DI Jin,ZHOU Xu-hong.Calculation method of critical buckling stress forstiffened plate with closed ribs[J].Journal of Traffic and Transportation Engineering,2012,12(05):37.
[7]王春生,袁卓亚,郭晓宇,等.钢板-混凝土组合加固混凝土T梁的抗弯性能试验[J].交通运输工程学报,2010,10(06):32.
 WANG Chun-sheng,YUAN Zhuo-ya,GUO Xiao-yu,et al.Flexural behavior experiment of reinforced concrete T-beams withsteel plate-concrete composite strengthening[J].Journal of Traffic and Transportation Engineering,2010,10(05):32.
[8]闫 斌,戴公连,董林育.客运专线斜拉桥梁轨相互作用设计参数[J].交通运输工程学报,2012,12(01):31.
 YAN Bin,DAI Gong-lian,DONG Lin-yu.Design parameters of track-bridge interaction on passenger dedicated line cable-stayed bridge[J].Journal of Traffic and Transportation Engineering,2012,12(05):31.
[9]闫 磊,张雪林,贺拴海.抗力分项系数双重迭代求解算法(英文)[J].交通运输工程学报,2011,11(03):1.
 YAN Lei,ZHANG Xue-lin,HE Shuan-hai.Double iteration solving method of resistance partial factor[J].Journal of Traffic and Transportation Engineering,2011,11(05):1.
[10]王全录,刘保东,杨成栋,等.回填施工对覆土波纹钢板拱桥受力性能的影响[J].交通运输工程学报,2011,11(03):22.
 WANG Quan-lu,LIU Bao-dong,YANG Cheng-dong,et al.Influence of backfilling construction on mechanical performance for soil-covered corrugated steel arch bridge[J].Journal of Traffic and Transportation Engineering,2011,11(05):22.

备注/Memo

备注/Memo:
收稿日期:2023-05-07
基金项目:国家自然科学基金项目(52008187); 福建省自然科学基金项目(2019J01779,2020J01477)
作者简介:林上顺(1972-),男,福建永泰人,福建理工大学教授,工学博士,从事装配式桥梁结构研究。
通讯作者:夏樟华(1980-),男,浙江淳安人,福州大学研究员,工学博士。
更新日期/Last Update: 2023-11-10